Oil Control Valve (Ocv; Oil Control Valve (Ocv) Removal/Installation; Oil Control Valve (Ocv) Inspection - Mazda 2002 6 Workshop Manual

Hide thumbs Also See for 2002 6:
Table of Contents

Advertisement

VARIABLE VALVE TIMING, OIL CONTROL VALVE (OCV)
Variable Valve Timing Actuator Removal Note
1. Set a wrench or equivalent tool at the hexagonal part of the camshaft to prevent rotation.
2. Loosen the variable valve timing actuator tightening bolts.
Variable Valve Timing Actuator Installation Note
1. Set a wrench or equivalent tool at the hexagonal part of the camshaft to prevent rotation.
2. Tighten variable valve timing actuator tightening bolts.
Tightening torque
69—75N·m {7.10—7.6 kgf·m, 50.9—55.3 ft·lbf}
End Of Sie

OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION

L3
1. Disconnect the negative battery cable.
2. Remove the plug hole plate.
3. Remove the high-tension lead. (See
4. Remove the oil control valve (OCV) connector.
5. Remove the ventilation hose.
6. Remove the cylinder head cover. (See
7. Remove in the order indicated in the table.
8. Install in the reverse order of removal.
.
1

Oil control valve (OCV)

End Of Sie

OIL CONTROL VALVE (OCV) INSPECTION

L3
Coil Resistance Inspection
1. Disconnect the negative battery cable.
2. Disconnect the oil control valve connector.
3. Measure the resistance between terminals A and
B using an ohmmeter.
• If not as specified, replace the oil control
valve.
Specification
6.9—7.9 ohms
4. Connect the oil control valve connector.
OIL CONTROL VALVE (OCV)
G–10–1 HIGH-TENSION LEAD
B–17 Cylinder Head Cover Installation
REMOVAL/INSTALLATION.)
Note.)
B
A6E222614420W01
AME2226W001
A6E222614420W02
AME2226W002
B–33

Advertisement

Table of Contents
loading

Table of Contents