Mazda RX-8 Workshop Manual page 2869

2011 - rx-8
Hide thumbs Also See for RX-8:
Table of Contents

Advertisement

3. Connect the SST (Deployment tool) to the SST (Adapter harness).
4. Connect the SST (Deployment tool) to the battery. Connect the power supply red clip to the positive
battery terminal, and the black clip to the negative battery terminal.
5. Verify that the red lamp on the SST (Deployment tool) is illuminated.
6. Verify that all persons are standing at least 6 m {20 ft} away from the vehicle.
7. Press the activation switch on the SST (Deployment tool) to operate (deploy) the side air bag module.
Curtain air bag module
1. Remove the tire house trim. (See
TIRE HOUSE TRIM
REMOVAL/INSTALLATION.)
2. Disconnect the curtain air bag module connector.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2011 rx-8

Table of Contents