(See
REFRIGERANT LINE
2Cooler pipe No.1
(See
REFRIGERANT LINE
3Condenser protector
4Condenser
(See
Condenser Installation
5. Install in the reverse order of removal.
6. Perform the refrigerant system performance test. (See
TEST.)
Condenser Installation Note
1. When replacing the new condenser, add compressor oil to the refrigeration cycle.
Supplemental amount (approx. quantity)
20 ml {20 cc, 0.7 fl oz}
< Previous Next >
REMOVAL/INSTALLATION.)
REMOVAL/INSTALLATION.)
Note.)
© 2010 Mazda North American Operations, U.S.A.
REFRIGERANT SYSTEM PERFORMANCE
Back to Top