SATO 9001226(A) Service Manual page 216

Tg3 series
Table of Contents

Advertisement

Section 7: Replacement Procedures
7.19 REPLACING SIDE HOLE SENSOR (cont'd)
Reverse the above procedures for reassembly.
13.
Insert the wiring harness firmly and arrange the wiring harnesses to ensure that they are not pinched
during installation.
To replace Side hole sensor (upper) board
Press the purple Lid Latch Lever to release the Lid Latch .
14.
Detach the Lid Latch assembly from the Media route frame based on step 3 to step 7 of Section 7.18
15.
Replacing Jump Hole Sensor .
Remove four screws (12) on both sides of the Lid Latch assembly and remove the Feed Cover ASSY
16.
(13).
On the Feed Cover (Bottom) (14), remove the two screw (15) securing the Upper Side hole sensor
17.
board (16).
Replace the defective Upper Side hole sensor board (16) and reverse the above procedures for reas-
18.
sembly.
Insert the wiring harnesses firmly and arrange the wiring harnesses to ensure that they are not pinched
during installation
After replacement, adjust the Side hole sensor condition based on Section 6.9.3 Side hole Sensor
19.
Sensitivity Adjustment .
Lid Latch
assembly
13
12
Page 7-32
14
15
16
15
TG3 Series Service Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tg308Tg312

Table of Contents