12. Position four hoses (A), (B), (C), and (D) against the support
as shown and secure the hoses with plastic ties.
13. Remove clamp (A) from the round plastic hose block.
262320
ASSEMBLING WINDROWER
Figure 3.24: Hydraulic Hose Routing
A - Hose (MD #111323) Connected To Valve Block Port B — Orange Tie
B - Hose (MD #111323) Connected To Valve Block Port A — Blue Tie
C - Hose (MD #111557) Connected To Valve Block Port E — Yellow Tie
D - Hose (MD #111328) Connected To Valve Block Port F — White Tie
Figure 3.25: Hose Block
51
A
D
C
B
A
Revision A