MacDon M155 Unloading And Assembly Instructions page 160

Self-propelled windrower
Table of Contents

Advertisement

5. Ensure that the float engagement pin is installed in storage
position (B) and NOT in engaged position (A).
IMPORTANT:
Removing the float will release the tension in the float
springs. This will prevent damage to the header lift linkages
when lowering the legs without a header or weight box
attached to the windrower.
DANGER
Ensure that all bystanders have cleared the area.
6. Start the engine and activate HEADER DOWN button (A) on
the ground speed lever (GSL) to fully retract the header lift
cylinders.
7. Press REEL UP switch (A) on the GSL to raise the center-link
until the hook is above the attachment pin on the header.
IMPORTANT:
If the center-link is too low, it may contact the header as
the windrower approaches the header for hookup.
262320
ATTACHING HEADERS
Figure 6.53: Header Float Linkage
Figure 6.54: Ground Speed Lever
Figure 6.55: Ground Speed Lever
144
A
A
B
A
Revision A

Advertisement

Table of Contents
loading

Table of Contents