Testing Reel Fore-Aft Activate Function Using Cab Display Module - MacDon M155 Unloading And Assembly Instructions

Self-propelled windrower
Table of Contents

Advertisement

7. Press SELECT (E) until ACTIVATE DWA DRV appears on the
upper line.
8. Press and hold HAZARD button (C).
• Press left arrow (B) to decrease the DWA drive speed.
• Press right arrow (D) to increase the DWA drive speed.
IMPORTANT:
Do NOT overspeed the DWA drive.
NOTE:
Ensure that the DWA drive is working properly.
9. Release HAZARD button (C). The DWA drive will stop.
10. Press PROGRAM (A) to exit programming mode or press
SELECT (E) to proceed to the next header function option.

7.9.9 Testing Reel Fore-Aft Activate Function Using Cab Display Module

The cab display module (CDM) can be used to test the reel fore-aft circuit, rather than using the controls on the operator's
station.
NOTE:
• The windrower must be attached to a header to perform this procedure.
• The engine must be running to perform this procedure.
DANGER
Ensure that all bystanders have cleared the area.
1. Start the engine.
2. Press PROGRAM (A) and SELECT (B) simultaneously on the
CDM to enter programming mode.
• WINDROWER SETUP? will appear on the upper line.
262320
CAB DISPLAY MODULE
A
B
Figure 7.146: DWA Drive
A
Figure 7.147: CDM Programming Buttons
269
CXXX
ACTIVATE DWA
MXXX
D 0
P 0
C
WINDROWER SETUP?
CXXX
MXXX
NO/YES
DRV
-
+
D
E
D
B
Revision A

Advertisement

Table of Contents
loading

Table of Contents