MacDon M155 Unloading And Assembly Instructions page 210

Self-propelled windrower
Table of Contents

Advertisement

10. Push down on the rod end of link cylinder (A) until hook (B)
engages and locks onto the header pin.
IMPORTANT:
The hook release must be down to enable the self-locking
mechanism. If the release is open (up), manually push it
down after the hook engages the header pin.
11. Check that center-link (A) is locked onto the header by
pulling upward on the rod end of the cylinder.
DANGER
Ensure that all bystanders have cleared the area.
12. Start the engine.
13. Press HEADER UP switch (A) to raise the header to its
maximum height.
14. If one end of the header does NOT fully raise, rephase the
lift cylinders as follows:
a.
Press and hold the HEADER UP switch until both
cylinders stop moving.
b. Continue to hold the switch for 3–4 seconds. The
cylinders are now phased.
NOTE:
It may be necessary to repeat this procedure if there is
air in the system.
262320
ATTACHING HEADERS
Figure 6.171: Hydraulic Center-Link
Figure 6.172: Ground Speed Lever
194
A
A
B
Revision A

Advertisement

Table of Contents
loading

Table of Contents