Testing Power Converter Voltages Star - Nortel DMS-100 Series Maintenance Manual

Star remote system
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

Application
Use this procedure to test power converter voltages for all power converters in
the Star Hub.
Interval
Perform this procedure once every 6 months.
Common procedures
Not applicable
Action
This procedure contains a summary flowchart as an overview of the procedure.
Follow the specific steps to perform this procedure.
Star Remote System routine maintenance procedures 13-37
Testing power converter voltages
DMS-100 Family NA100 Star Remote System XPM15 and up
STAR

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents