4-24 Star Remote System automatic maintenance
Refer to Extended Peripheral Module Log Report Reference Manual,
297-8321-840 for the exact syntax of test result reasons.
If an LCM-level test does not run because of equipment that is not available
before the drawer tests, the following activities occur:
If a drawer test does not run, the drawer remains in its current state and is tested
in a later window.
QUERYPM FLT command
Additional information to the QUERYPM FLT command at the MAP display
level of the LCM lists all drawers that fail the BRT and are set ISTb. The node
ISTb reason is reset to DRAWER FAULT.
Restarts The following information applies to both manual and system-level
restarts.
Interactions The BIC relay test uses the test access bus, the metallic test
equipment (MTE), and a single NT6X17 card within each drawer to complete
testing. An ALT test runs at the same time as a BRT and can delay both tests
because the tests compete for the same test equipment.
If REX is running on a given LCM, BRT is not run on that LCM. The LCM
remains in its current state, and a PM181 is output, indicating the BRT did not
run because of the REX in progress.
297-8353-550 Standard 05.01 March 2001
the LCM is not tested
a PM181 log is output
the LCM node state is not changed
warm or cold
— All drawer-level tests are aborted.
— All ISTb reasons are saved.
— All LCM-level tests are aborted, and are system-level only if the tests
are within the window. The test will continue after the restart. LCMs
already tested are not tested again.
reload
— The BRT is reset as if the RESET option of the BICRELAY command
were supplied.
— The ON/OFF settings of the BICRELAY command are kept.
— The state of the SUPPRESS/ALLOW commands is kept.
— ISTb reasons are cleared.