CAUTION
Check to be sure all bystanders have cleared the area.
17. Start engine and activate HEADER DOWN switch (A)
on GSL to lower header fully.
remove key.
18. Connect header drive hoses (A) and electrical
harness (B) to header. Refer to the auger header
operator's manual.
4.5.4 Detaching an A-Series Header
Refer to the procedure that is appropriate for the center-link installed on the windrower:
•
Detaching an A-Series Header: Hydraulic Center-Link, page 160
•
Detaching an A-Series Header: Mechanical Center-Link, page 163
169890
OPERATION
Stop engine and
Figure 4.149: GSL
Figure 4.150: Header Drive Hoses and Harness
159
Revision A