ABB PickMaster Twin - PowerPac Applications Manual page 319

Table of Contents

Advertisement

Simulation
1
2
3
Switching to Online environment and configuration
1
2
3
4
Application manual - PickMaster® Twin - PowerPac
3HAC064218-001 Revision: B
5.1 Example: One pick work area and one place work area
Action
On the ribbon-tab, click Start under Sim-
ulation to start the simulation.
On the ribbon-tab, click Stop under Sim-
ulation to stop the simulation.
On the ribbon-tab, click Reset under
Simulation to clean up the items on the
conveyors in the solution.
Action
Right-click the RunTime in the tree view
Cell and select Start Local RRT.
Right-click the RunTime in the tree view
Cell and select Connect to RRT.
In the Sign in dialog, enter the correct
information.
Note
A default admin user, with full access, is
provided with the following credentials:
User: admin
Password: password
Click OK.
© Copyright 2021 ABB. All rights reserved.
5 Production examples
Note/Illustration
xx2000000317
xx2000000318
xx2000000319
Note/Illustration
xx1800001387
xx2000000314
xx1800001388
Continues on next page
Continued
319

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pickmaster twin

Table of Contents