ABB PickMaster Twin - PowerPac Applications Manual page 340

Table of Contents

Advertisement

5 Production examples
5.3 Example: Mixing one pick work area and two place work areas
Continued
8
9
10
11
12
13
14
15
16
17
18
Continues on next page
340
Action
In the Conveyor Workarea window, enter
"LinearWA1" in the Workarea Name text
box.
In the Conveyor Board drop down list,
select the correct conveyor board which
has been connected to the liner conveyor.
Tip
The connection between the conveyor
board and the conveyor are defined by
users.
In the Conveyor drop down list, select
the "Linear1" conveyor.
In the Workarea Type radio box, select
the "Place" option.
Click OK to finish the adding of the linear
1 conveyor work area.
On the ribbon-tab, click Workarea under
Layout.
In the Conveyor Workarea window, enter
"LinearWA2" in the Workarea Name text
box.
In the Conveyor Board drop down list,
select the correct conveyor board which
has been connected to the second liner
conveyor.
Tip
The connection between the conveyor
board and the conveyor are defined by
users.
In the Conveyor drop down list, select
the "Linear2" conveyor.
In the Workarea Type radio box, select
the "Place" option.
Click OK to finish the adding of the linear
2 conveyor work area.
© Copyright 2021 ABB. All rights reserved.
Note/Illustration
xx1900000482
xx1800001417
xx1900000483
Application manual - PickMaster® Twin - PowerPac
3HAC064218-001 Revision: B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pickmaster twin

Table of Contents