ABB PickMaster Twin - PowerPac Applications Manual page 305

Table of Contents

Advertisement

Application manual - PickMaster® Twin - PowerPac
3HAC064218-001 Revision: B
The Production window is opened.
xx1800001738
2 Select the recipe which will be running.
xx1800001739
3 If need, select the Loop checkbox in the Ghost Picking.
Note
If the Loop checkbox is selected, the ghost picking will repeat sending the
recorded position data to the real controller until the Stop icon is clicked.
If the Loop checkbox is not selected, the ghost picking will send the
recorded position data to the real controller for just one time and stopped
automatically.
© Copyright 2021 ABB. All rights reserved.
4 Working with PickMaster PowerPac
4.5 Ghost Picking
Continued
Continues on next page
305

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pickmaster twin

Table of Contents