ABB PickMaster Twin - PowerPac Applications Manual page 304

Table of Contents

Advertisement

4 Working with PickMaster PowerPac
4.5 Ghost Picking
Continued
Ghost picking flow
Use this procedure to run a ghost picking flow:
Continues on next page
304
7 Add the Conveyor WA 1 to the Accept by dragging under the Distribution
Setting tab.
xx1800001732
8 Click OK to close the Recipe setting window.
Note
To run the ghost picking, the work area signals need to be set as predefined
signals.
1 On the PickMaster PowerPac ribbon-tab, click Production.
xx1800001737
© Copyright 2021 ABB. All rights reserved.
Application manual - PickMaster® Twin - PowerPac
3HAC064218-001 Revision: B