Inspection Of Surface Treatment (Foundry Prime) - ABB IRB 4400/60 Product Manual

Hide thumbs Also See for IRB 4400/60:
Table of Contents

Advertisement

3 Maintenance

3.4.5 Inspection of surface treatment (Foundry Prime)

3.4.5 Inspection of surface treatment (Foundry Prime)
Introduction to inspection of surface treatment
Damage to painted surfaces must be repaired as soon as possible to avoid
corrosion. All painted surfaces on the robot must be inspected.
Required equipment
Equipment, etc.
Touch up paint Foundry Prime 2, grey
Additional equipment - Foundry Prime
Equipment
Rust preventive
Sikaflex 521FC
Loctite 574
Brush
Foundry Prime touch up kit
Inspection and repair of surface treatment
Use this procedure to inspect the surface treatment on Foundry Prime robots.
1
2
108
Action
Inspect all painted surfaces for damages.
Repair damages as described in the instruc-
tion included in the spare part kit.
© Copyright 2004-2018 ABB. All rights reserved.
Note
See Touch up paint for Foundry Prime robots in
partlistSpare Part lists on page
Article number
Note
3HAC034903-001
Mercasol. Recommended
drying time is 24h.
3HAC026759-001
12340011-116
3HAC035355-001
Information
295.
Product manual - IRB 4400
3HAC022032-001 Revision: Q

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 4400/l10

Table of Contents