Installing the MX2008
IN THIS SECTION
Installing the MX2008 Mounting Hardware for a Four-Post Rack or Cabinet | 241
Removing Components from the MX2008 Router Chassis Before Installing It in a Rack | 245
Installing an MX2008 Router Using a Pallet Jack Overview | 259
Tools Required to Install the MX2008 Router Using a Pallet Jack | 259
Installing the Pallet Jack Attachment | 260
Installing the MX2008 Router Using a Pallet Jack with Attachment | 261
Installing an MX2008 Router Using a Router Transport Kit Overview | 265
Tools Required to Install the MX2008 Router Using a Router Transport Kit | 266
Installing the Router Transport Kit on the MX2008 | 267
Securing the MX2008 Router to the Router Transport Platform | 269
Using the Router Transport Kit to Install the MX2008 Router in a Four-Post Rack | 272
Using the Router Transport Kit to Install the MX2008 Router in an Open-Frame Rack | 279
Reinstalling Components in the MX2008 Router After Initially Installing the Router in a Rack | 284
Installing the MX2008 Mounting Hardware for a Four-Post Rack or Cabinet
Installing Cage Nuts, If Needed | 241
1.
Installing the Four-Post Mounting Shelf | 243
2.
Removing the Center-Mounting Brackets | 244
3.
Installing Cage Nuts, If Needed
Insert cage nuts, if needed, into the holes listed in
hole distances are relative to the standard U division on the rack that is aligned with the bottom of the
mounting shelf.
To install cage nuts in a four-post rack:
1. On the rear side of both rack rails, insert cage nuts in the holes specified for the four-post mounting
shelf. Install the cage nuts in the front of the front rail (see
Table 102 on page 242
and
Table 102 on page
Table 103 on page
242. The
242).
241