Juniper MX2008 Hardware Manual page 207

Universal routing platform
Hide thumbs Also See for MX2008:
Table of Contents

Advertisement

Table 88: MX2008 Site Preparation Checklist (continued)
Item or Task
Measure distance between
external power sources and
router installation site.
Locate sites for connection of
system grounding.
Calculate the power
consumption and
requirements.
Rack
Verify that your rack meets
the minimum requirements for
the installation of the router.
Plan rack or cabinet location,
including required space
clearances.
NOTE:
If you are installing the
MX2008 router into a network
cabinet, make sure that no
hardware, device, rack, or
cabinet component obstructs
the 24-U rack space from
access during installation.
If a rack is used, secure rack to
floor and building structure.
Cables and Transceivers
For More Information
"MX2008 DC Power
Distribution Module (-48 V)
Description" on page 96
"MX2000 DC Power
Distribution Module (240 V
China) Description" on page 97
"MX2008 Router Grounding
Specifications" on page 203
"MX2008 AC Power
Requirements" on page 74
"MX2008 DC Power
Requirements" on page 105
"MX2008 Rack Requirements"
on page 198
"MX2008 Cabinet Size and
Clearance Requirements" on
page 193
"MX2008 Cabinet Size and
Clearance Requirements" on
page 193
"MX2008 Rack Requirements"
on page 198
"Clearance Requirements for
Airflow and Hardware
Maintenance for the MX2008
Router" on page 208
"MX2008 Rack Requirements"
on page 198
Performed By
Date
207