Juniper MX2008 Hardware Manual page 12

Universal routing platform
Hide thumbs Also See for MX2008:
Table of Contents

Advertisement

Maintaining Host Subsystem components | 409
Replacing an MX2008 RCB | 409
Removing an MX2008 RCB | 410
Installing an MX2008 RCB | 411
Upgrading the MX2008 Routing and Control Board (RCBs) in a Redundant Host Subsystem | 414
Taking the Host Subsystem Offline | 414
Removing the Backup RCB | 415
Installing the REMX2008-X8-64G RCB | 416
Verifying and Configuring the Upgraded RCB as the Master | 417
Verifying and Configuring the Upgraded RCB as the Backup | 417
Upgrading the MX2008 Routing and Control Board (RCBs) in a Nonredundant Host
Subsystem | 418
Taking the Host Subsystem Offline | 418
Removing the MX2008 RCB | 419
Installing the MX2008 RCB | 420
Verifying and Configuring the Upgraded MX2008 RCB | 421
Maintaining MX2008 Power System Components | 422
Replacing an MX2008 AC Power Supply Module | 422
Removing an MX2008 AC Power Supply Module | 422
Installing an MX2008 AC Power Supply Module | 424
Replacing an MX2000 Three-Phase Delta AC Power Distribution Module | 426
Removing an MX2000 Three-Phase Delta AC Power Distribution Module | 427
Installing an MX2000 Router Three-Phase Delta AC Power Distribution Module | 432
Replacing an MX2008 Three-Phase Delta AC Power Cord | 439
Removing an MX2008 Three-Phase Delta AC Power Cord | 439
Installing an MX2008 Three-Phase Delta AC Power Cord | 442
Replacing an MX2020 Three-Phase Wye AC Power Distribution Module | 446
Removing an MX2000 Three-Phase Wye AC Power Distribution Module | 446
Installing an MX2000 Router Three-Phase Wye AC Power Distribution Module | 451
Replacing an MX2008 Three-Phase Wye AC Power Cord | 457
Removing an MX2008 Three-Phase Wye AC Power Cord | 458
Installing an MX2008 Three-Phase Wye AC Power Cord | 461
xii

Advertisement

Table of Contents
loading

Table of Contents