Testing For Leaks; Yearly Maintenance - Siemens Rapidlab 1200 Operator's Manual

Table of Contents

Advertisement

Rapidlab 1200 Operator's Guide: Maintenance
c. Disconnect the tubing from the connector at the pressure sensor bubbler.
5. Connect the new tubing:
a. Connect the new tubing to the spring-loaded latch.
b. Push the new tubing into the pinch valve.
c. Connect the new tubing to the pressure sensor bubbler.
6. Close the measurement module door.
7. Select
8. Reinstall the reagent cartridge and close the reagent cartridge door.
9. Close the front cover.
10. Dispose of the tubing according to your institution's protocol.

Testing for Leaks

1. To ensure that the tubing has been properly reinstalled, perform the Leak Test.
Refer to Performing the Leak Test‚ page 6-37.
2. Select

Yearly Maintenance

Yearly maintenance includes the following tasks:
Replacing the measurement module tubing and pressure sensor bubbler
Replacing the CO-ox tubing
Replacing the reagent manifold
Replacing the AutomaticQC manifold
Replacing the air filters
Center the tubing and ensure the tubing does not have any sharp bends.
.
No
Return > Analyze > Yes
.
5-11
02087462 Rev. V

Advertisement

Table of Contents
loading

Table of Contents