Instrument Maintenance; Maintenance Schedule - Teledyne T200 Operation Manual

No/no2/nox analyzer
Hide thumbs Also See for T200:
Table of Contents

Advertisement

11.

INSTRUMENT MAINTENANCE

ATTENTION

11.1. MAINTENANCE SCHEDULE

I
MPORTANT
06858E DCN7057
Follow the maintenance schedule set forth in Section 11.1. In general, the exterior can
be wiped down with a lightly damp cloth.
COULD DAMAGE INSTRUMENT AND VOID WARRANTY
Avoid spraying anything directly onto any part of the analyzer.
Service and troubleshooting are covered in Section Troubleshooting & Service.
Table 11-1 shows a typical maintenance schedule for the T200. Please note that in
certain environments (i.e. dusty, very high ambient pollutant levels) some maintenance
procedures may need to be performed more often than shown.
WARNING – E
D
ISCONNECT POWER BEFORE PERFORMING ANY OF THE FOLLOWING
OPERATIONS THAT REQUIRE ENTRY INTO THE INTERIOR OF THE ANALYZER
These maintenance procedures must be performed by qualified technicians only.
A span and zero calibration check (see CAL CHECK REQ'D Column of Table 11-1,
T200 Maintenance Schedule) must be performed following some of the
maintenance procedures listed herein. To perform a CHECK of the instrument's
Zero or Span Calibration, refer to Section 9.3.
DO NOT press the ENTR button at the end of each operation. Pressing the ENTR
button resets the stored values for OFFSET and SLOPE and alters the instrument's
Calibration.
Alternatively, use the Auto Cal feature described in Section 9.5 with the
CALIBRATE attribute set to OFF.
LECTRICAL
– Q
CAUTION
UALIFIED
I
R
MPACT ON
EADINGS OR
S
H
HOCK
AZARD
P
ERSONNEL
D
ATA
.
207

Advertisement

Table of Contents
loading

This manual is also suitable for:

T200uT201T265T200u-noyT200up

Table of Contents