Maintenance Schedule - Teledyne TEXIO PTE6-200 Operating Instructions Manual

Percent oxygen analyzer
Table of Contents

Advertisement

Percent Oxygen Analyzer
4.9

Maintenance Schedule

This feature is to add a reminder in the software for the operator to
perform some sort of maintenance on the analyzer after some time
period. This feature could be used to remind operators that it might be
time to replace the sensor before its useful time is depleted.
To set the maintenance reminder, the operator must set the time and
start the counter by setting up the "Maint Schedule" function in the
system menu.
Teledyne Analytical Instruments
Operation
103

Advertisement

Table of Contents
loading

Table of Contents