2.2 Instrument Location

The CombiFlash Rf
small footprint, requiring about 1550 square centimeters (240
2
in
) of level bench space. Ensure that the system has at least 3
cm (1.25") of air space behind it for ventilation. Additional
space may be required for solvent and waste containers.
The optional 4x expansion module is installed to the left of the
system. This module requires an additional 933 cm
of level bench space. Ensure that the module has at least 3 cm
(1.25") of air space behind it for ventilation. Instructions for
installing the 4x module can be found in Section 4 of this
guide.
Refer to Table 1-1 for environmental conditions and power
requirements.
The system is heavy. Use a two-person lift to prevent injury.
Before making any connections to the CombiFlash Rf system,
place it on the bench or in the fume hood where it will be
operated. Temporarily position the system so you can access
the back panels to complete the connections.

2.3 Connect Power

Ensure that the On/Standby switch below the touch screen
panel is in the Standby position. Then, use the supplied IEC
power cord to connect the system to mains power.
Mains power must meet the voltage, frequency, and amperage
requirements listed on the serial number label.
As long as the AC mains power cord is connected, power is
inside the unit. The mains power cord is the disconnect device.
Position the system so that the power cord can be unplugged,
or use a power strip where the plug can quickly be removed
from the outlet in the event of an emergency.
+
+
and Rf
Lumen systems have a relatively
WARNING
WARNING
WARNING
2
2
(145 in
)
2-3

Advertisement

Table of Contents
loading

Table of Contents