Teledyne CombiFlash Rf User Manual page 96

Table of Contents

Advertisement

Figure 4-8 Channel 1 waste tubing connections
(All other connections
not shown)
Figure 4-9 Channels 2 through 4 waste tubing connections
8. The post-run valve cleaning fluids share a common port for
channels 2 through 4. Select the 48 inch (120 cm) length of
black tubing from the accessory package and connect it to
the Valve Waste Out bulkhead fitting on the Rf 4x module.
Route the other end of this tubing to one of the waste
bottles. (The channel 2 waste bottle is shown in
Figure 4-10.) You can alternatively route it to a container
other than those used for channels 2 through 4, however
the system will not be able to detect the level and prevent
overfilling.
To Waste Bottle 1
To
Waste
Bottle 2
To
Waste
Bottle 3
Section 4 Preparation: Optional 4x Module
(All other connections not shown)
To
Waste
Bottle 4
4-11

Advertisement

Table of Contents
loading

Table of Contents