System Preparation; Unpacking The Unit; Instrument Location - Teledyne Installation Guide Installation Manual

Table of Contents

Advertisement

This section provides instructions for unpacking and installing
the CombiFlash R
operation, sequentially follow all instructions in sections 2.1
through 2.12.

2.1 Unpacking the Unit

The CombiFlash R
unpack the shipment and inspect the contents. If there is any
damage to the shipping carton or any components, contact the
shipping agent and Teledyne Isco (or its authorized
representative) immediately.
If there is any evidence that the system has been damaged in
shipping, do not plug it into AC power. Contact Teledyne Isco
or its authorized representative for advice.
Compare the contents of the boxes with the enclosed packing
slip. If there are any shortages, contact Teledyne Isco
immediately.

2.2 Instrument Location

The CombiFlash R
about 1550 square centimeters (240 in
Ensure that the CombiFlash R
space behind it for ventilation. Additional space may be
required for solvent and waste containers.
Refer to Table 1-1 for environmental conditions and power
requirements.
Installation Guide
Section 2 System Preparation
system. To prepare the system for
f
is shipped in a single carton. Carefully
f
WARNING
has a relatively small footprint, requiring
f
CombiFlash
2
) of level bench space.
has at least 3 cm (1.25") of air
f
®
R
f
2-1

Advertisement

Table of Contents
loading

Table of Contents