Teledyne CombiFlash Rf User Manual page 65

Table of Contents

Advertisement

Section 2 Preparation: Rf + , Rf + Lumen, Rf+ PurIon, and EZ Prep Systems
Table 2-1 Installation Qualification Checklist
Step
Description
2.1
U
NPACKING THE
2.2
I
NSTRUMENT
2.3
C
P
ONNECT
2.4
C
S
ONNECT
(E
XCLUDES
2.5
C
W
ONNECT
(E
XCLUDES
2.7
E
XTERNAL
2.8
C
ONNECT AND
L
INES
2.9
P
OSITION THE
2.10
I
C
NSTALL
OLLECTION
R
ACKS
2.11
E
XTERNAL
(O
)
PTIONAL
2.12
T
P
URN ON
2.13
C
ONFIGURE THE
2.14
P
RIME THE
2.15
S
V
YSTEM
ERIFICATION
Certification of Section 2 Completion
Installer Name (print):
Installer Signature:
Operator Name (print):
Operator Signature:
Comments:
U
NIT
L
OCATION
OWER
L
OLVENT
INES
EZ P
)
REP
L
ASTE
INES
EZ P
)
REP
G
(Optional)
AS
R
D
OUTE
RAIN
S
YSTEM
T
UBE
D
ETECTOR
OWER
S
YSTEM
S
L
OLVENT
INES
Date:
Date:
Installer
Initials
Operator
Initials
2-29

Advertisement

Table of Contents
loading

Table of Contents