Nortel DMS-100 Series Maintenance Manual page 125

Remote line concentrating module with extended distance capability
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

20
To attempt to RTS the RLCM-EDC and switch load to the standby bank, type
>RTS PM SWLD
and press the Enter key.
Example of a MAP response:
Existing loads: Unit 0: Act:REDC07AA *FLT*
New loads after a successful RTS will be:
Unit 0: Act:REDC07AA
Unit 1: Act:REDC07AA
Do you wish to continue?
Please confirm ("YES", "Y", "NO", or "N"):
If RTS
passes
fails, and the system produces a
card list
fails, and the system does not
produce a card list
results in load failure
21
The card list identifies the cards most at risk for faults. Replace the cards one
at a time in the order listed from top to bottom.
If you
replaced the last card on the list
did not replace the last card on the
list
RLCM-EDC alarm clearing procedures 5-11
Unit 1: Act:REDC07AA *FLT*
Stby:REDC07AA *FLT*
Stby:REDC07AA *FLT*.
DMS-100 Family Maintenance Manual ABSK007
critical
Stby:REDC07AA
Stby:REDC07AA
Do
step 32
step 21
step 25
step 22
Do
step 26
step 25
PM LCM
(continued)