Nortel DMS-100 Series Maintenance Manual page 126

Remote line concentrating module with extended distance capability
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

5-12 RLCM-EDC alarm clearing procedures
PM LCM
critical
(continued)
22
23
Existing loads: Unit 0: Act:REDC07AA *FLT*
New loads after a successful RTS will be:
Do you wish to continue?
Please confirm ("YES", "Y", "NO", or "N"):
24
25
297-8381-550 Standard 02.02 April 1999
To attempt to reload the RLCM-EDC, type
>LOADPM PM CC
and press the Enter key.
If load
passes
fails in one unit
fails
To attempt to RTS the RLCM-EDC again, and switch load to standby banks,
type
>RTS PM SWLD
and press the Enter key.
Example of a MAP response:
Unit 1: Act:REDC07AA *FLT*
Unit 0: Act:REDC07AA
Unit 1: Act:REDC07AA
If RTS
passes
fails
Contact the carrier maintenance support group for maintenance on the open
links or the unstable links. When carriers are restored, go to step 17.
For additional help, contact the maintenance support group.
Do
step 23
step 30
step 25
Stby:REDC07AA
Stby:REDC07AA
Stby:REDC07AA *FLT*
Stby:REDC07AA *FLT*.
Do
step 32
step 25

Advertisement

Table of Contents
loading

Table of Contents