Nortel DMS-100 Series Maintenance Manual page 112

Remote line concentrating module with extended distance capability
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

4-12 RLCM-EDC recovery procedures
RLCM-EDC recovery procedure
22
23
Existing loads: Unit 0: Act:REDC07AA *FLT*
New loads after a successful RTS will be:
Do you wish to continue?
Please confirm ("YES", "Y", "NO", or "N"):
24
25
297-8381-550 Standard 02.02 April 1999
To attempt to reload the RLCM-EDC, type
>LOADPM PM CC
press the Enter key.
If load
passes
fails in one unit
fails
To attempt again to RTS the RLCM-EDC and activate the loads in the standby
banks, type
>RTS PM SWLD
and press the Enter key.
Example of a MAP response:
Unit 1: Act:REDC07AA *FLT*
Unit 0: Act:REDC07AA
Unit 1: Act:REDC07AA
If RTS
passes
fails
Contact your maintenance support group for more instructions on how to clear
this fault.
Contact the carrier maintenance support group for maintenance on the open
links or unstable links. When carriers are restored, go to step 17.
(continued)
Do
step 23
step 30
step 24
Stby:REDC07AA *FLT*
Stby:REDC07AA *FLT*.
Do
step 32
step 24
Stby:REDC07AA
Stby:REDC07AA

Advertisement

Table of Contents
loading

Table of Contents