Installing The Clamp Bracket; Installing The Pt Unit - SELVA MARINE Pike 9,9 Service Manual

Table of Contents

Advertisement

Installing the clamp bracket

1. Tighten the self-locking nut 1 completely
onto the shorter threaded end of the
through tube 2.
a
2
a b
2. Assemble the clamp brackets 3 and
swivel bracket 4, and then install the
through tube 2 from the port side.
3. Install the self-locking nut 5 onto the
through tube 2, and then tighten it to the
specified torque.
4. Install the ground lead terminals 6 to the
brackets using the bolt 7 and bolts 8.
5. Install stopper 1 9, stopper 2 =, and the
stopper nuts A.
A A
5
3
A
9
7
8
6
NOTE:
Install the anode B with the projection facing
towards the bow.
6AU3K11
7
A A
1
b
A A
S6AG7800
4
A A
3
2
0
A
B
S6AU7055
Clamp bracket and swivel bracket (PT model)
Self-locking nut 5:
19 N·m (1.9 kgf·m, 14.0 ft·lb)
Ground lead bolt 7:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
Anode bolt 8:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
Stopper nut A:
24 N·m (2.4 kgf·m, 17.7 ft·lb)

Installing the PT unit

1. Fully tilt the outboard motor up, and then
support it with the tilt stop lever.
WARNING
After tilting the outboard motor up, be
sure to support it with the tilt stop lever.
1
2
7
3
4
S6AU7056
5
6
7
8
9
7-34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents