Bleeding The Pt Unit - SELVA MARINE Pike 9,9 Service Manual

Table of Contents

Advertisement

J
H
I
11. Place the tilt cylinder end screw 5 at the
bottom of the tilt ram 6.
12. Install the tilt ram assembly into the cylin-
der.
6
5
13. Tighten the tilt cylinder end screw to the
specified torque.
6AU3K11
J
H
I
S6AU7098

Bleeding the PT unit

NOTE:
Make sure that the tilt ram is fully extended.
1. Place the PT unit in an upright position.
2. Turn the manual valve 1 clockwise 90°
to close it.
S6AU7099
B
Power tilt wrench B: 90890-06560
Tilt cylinder end screw 5:
45 N·m (4.5 kgf·m, 33.2 ft·lb)
PT cylinder
1
2
3
S6AU7100
4
7
5
6
7
8
9
7-52

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents