Removing The Tiller Handle; Installing The Tiller Handle - SELVA MARINE Pike 9,9 Service Manual

Table of Contents

Advertisement

BRKT

Removing the tiller handle

1. Disconnect the engine shut-off switch
leads and engine start button leads (E
model).
NOTE:
To disconnect the leads, see "Electrical com-
ponent and wiring harness routing" (8-1).
2. Disconnect the throttle cables 1 from the
throttle cam 2.
2
2
3. Remove the tiller handle.
NOTE:
See the exploded diagram for disassembly
(7-2).

Installing the tiller handle

1. Assemble the tiller handle.
NOTE:
See the exploded diagram for assembly (7-
2).
2. Install the throttle friction adjuster 1, and
then install the cotter pin 2.
1
7-3
Bracket unit
1
S6AU7117
2
S6AU7118
3. Install the engine shut-off switch 3 to the
7
tiller handle 4, and then tighten the nut
5 to the specified torque. Pass the
engine shut-off switch lead through a
hole in the pivot section of the tiller han-
dle.
NOTE:
Route the engine shut-off switch lead 6 as
shown, making sure to fit it securely into the
7
notch a in the tiller handle 4.
Engine shut-off switch nut 5:
2 N·m (0.2 kgf·m, 1.5 ft·lb)
4. Connect the throttle cable ends to the
throttle pulley 7.
7
5
4
3
6
a
8
b
b
S6AU7119
4
S6AU7120
S6AU7121
6AU3K11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents