SELVA MARINE Pike 9,9 Service Manual page 243

Table of Contents

Advertisement

F PT switch lead (PT model)
È Install the terminal plate, making sure that it contacts the PT relay. (PT model)
É Route the lighting coil lead to the outside of the crankcase pin.
Ê Route the oil pressure switch lead in the direction shown.
Ë Fit the oil pressure switch lead into the groove in the driven sprocket cover.
Ì Bend the side of the junction box outward as shown.
Í Route the battery cable under the bracket.
Î Route the warning indicator lead under the shift cable.
Ï Fasten the PT motor lead with the holder, making sure that there is no slack in the lead. (PT model)
6AU3K11
Electrical component and wiring harness routing
1
2
3
4
5
6
7
8
9
8-6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents