Checking The Rectifier - SELVA MARINE Pike 9,9 Service Manual

Table of Contents

Advertisement

+
ELEC
2. Measure the lighting coil 1 output peak
voltage. Replace if below specification.
È
1
G
G
G
G
É
1
G/W
G/W
G
È Lighting coil (1 coil)
É Lighting coil (2 coils)
NOTE:
• To prevent the engine from starting when
cranking it, be sure to disconnect both
spark plug caps.
• Do not remove the clip from the engine
shut-off switch.
8-37
Electrical system
R
B
S6AU8053
R
G
B
S6AU8059
Lighting coil (1 coil) output peak
voltage:
Green (G) – Green (G)
r/min
Cranking
DC V
6.1
Lighting coil (2 coils) output peak
voltage:
Green/White (G/W) – Green (G)
r/min
Cranking
DC V
16.1
3. Measure the lighting coil resistance.
Replace if out of specification.
Lighting coil (1 coil) resistance
(reference data):
Green (G) – Green (G)
0.24–0.36 Ω at 20 °C (68 °F)
Lighting coil (2 coils) resistance
(reference data):
Green/White (G/W) – Green (G)
0.61–0.91 Ω at 20 °C (68 °F)
4. Connect the lighting coil connectors.

Checking the Rectifier

1. Measure the Rectifier 1 output peak
voltage. Check the Rectifier for continuity
if the output peak voltage is below speci-
fication.
Unloaded
1,500
3,500
14.6
33.1
Unloaded
1,500
3,500
33.3
79.1
6AU3K11
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents