Checking The Pt Switch - SELVA MARINE Pike 9,9 Service Manual

Table of Contents

Advertisement

BRKT
2. Connect the positive battery lead to the
light green (Lg) lead 6, and the negative
battery lead to the black (B) terminal 1
as shown, and then check the PT relay
for continuity. Replace the PT relay if out
of specification.
1
2
3
4
5
Sb
PT relay continuity
Red (R) 2 – Green (G) 3
Red (R) 2 – Blue (L) 4
Green (G) 3 – Blue (L) 4
3. Connect the positive battery lead to the
sky blue (Sb) lead 5, and the negative
battery lead to the black (B) terminal 1
as shown, and then check the PT relay
for continuity. Replace the PT relay if out
of specification.
1
2
3
4
5
Sb
7-55
Bracket unit
B
R
G
L
Sb
Lg
6
Lg
S6AU7107
Continuity
No continuity
B
R
G
L
Sb
Lg
6
Lg
S6AU7108
PT relay continuity
Red (R) 2 – Blue (L) 4
Red (R) 2 – Green (G) 3
Green (G) 3 – Blue (L) 4

Checking the PT switch

1. Check the PT switch for continuity.
Replace if out of specification.
Lg
Sb
R
Lg
Sb
R
Switch
Sky blue
position
(Sb)
Free
Up
Down
Continuity
No continuity
S6AG7890
Lead color
Red (R)
Light
green
(Lg)
6AU3K11
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents