SELVA MARINE Pike 9,9 Service Manual page 255

Table of Contents

Advertisement

È Route the engine shut-off switch lead under the throttle cables.
É Route the engine shut-off switch lead along the tiller handle bracket so that it does not contact the throttle
shaft, and then route it and the throttle cables through the corrugated tube.
Ê Fasten the engine start button lead at the white tape with a plastic tie. Install the plastic tie as shown. (E
model)
Ë Align the blue tape on the engine start button lead with the grommet in the bottom cowling. Position the
slack in the engine start button lead toward the tiller handle. (E model)
6AU3K11
Electrical component and wiring harness routing
1
2
3
4
5
6
7
8
9
8-18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents