SELVA MARINE Pike 9,9 Service Manual page 216

Table of Contents

Advertisement

BRKT
2. Install the collar 1 onto the PT unit 2.
3. Install the PT unit 2, collars 3 and 4,
shaft 5, and washers 6 onto the clamp
brackets 7, and then tighten the bolts 8
to the specified torque.
4. Install the collars 9 and 0, upper end of
the tilt ram, shaft A, and E-clip B to the
swivel bracket.
5. Install the ground lead terminal C to the
PT unit 2.
A
A
9
8
6
4
A
A
C
NOTE:
Install the ground lead C as shown.
PT unit mounting shaft bolt 8:
18 N·m (1.8 kgf·m, 13.3 ft·lb)
Ground lead bolt D:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
7-35
Bracket unit
A
1
B
A
D
C
A
7
4
5
6
S6AU7057
D
BOW
S6AU7113
6. Pass the PT motor lead E through the
hole a in the clamp bracket (STBD).
7. Fasten the PT motor lead E to the clamp
bracket with a plastic tie F.
E
b
0
NOTE:
Route the PT motor lead E to the front of
2
stopper 1 b.
3
8. Apply grease to all grease nipples until it
comes out from the areas c.
A A
8
F
c
c
A A
a
S6AU7058
S6AU7059
6AU3K11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents