430 Chapter 8: Recovery/replacement procedures
553-3211-510 Standard 1.0 October 1998
Procedure 20: Load the operating system tape on an IPE Module or an
Application Module with an MVME167 card (continued)
Figure 98
BOS installation, completion
***> Unmounting all mounted file systems
***> Synchronizing the installation disk
BOS product installation is completed.
You must RESET the system and allow it to autoboot from the hard disk
31
Remove the operating system tape from the drive.
32
Proceed with Procedure 21 and go through the setup.
**************************
**** RESET THE SYSTEM ****
**************************