Nortel Meridian Meridian 1 Maintenance Manual page 423

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Procedure 19: Load the operating system tape on an Application
Module with an MVME147 card (continued)
Figure 68
BOS installation, completion
Re-enter new password:
***> Unmounting all mounted file systems
***> Synchronizing the installation disk
You must RESET the system and allow it to autoboot from the hard disk
.
34
Remove the BOS tape from the drive.
Note: Procedure 20 is for the IPE Module or MVME167 card.
35
Proceed with Procedure 21 and go through the setup.
Meridian Link Release 5C/CCR Release 3C Diagnostic and Maintenance Guide
Chapter 8: Recovery/replacement procedures 411
BOS product installation is completed.
**************************
**** RESET THE SYSTEM ****
**************************

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents