Nortel Meridian Meridian 1 Maintenance Manual page 236

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

224
Chapter 4: Diagnosing faults
553-3211-510 Standard 1.0 October 1998
If modems are used, both the Application Module and the host
computer connections should be configured as DTE.
Perform the following steps to configure the Host Link (link 1) on the
Application Module as DCE or DTE.
¥
Perform Procedure 3: Hardware powerdown.
¥
Perform Procedure 18: Replace or reconfigure the Application
Module MVME705B transition card.
¥
Perform Procedure 4: Power up the Application Module or IPE
Module.
¥
Log in as mlusr and verify that the physical DTE/DCE
configuration parameter matches the DTE/DCE configuration on
the MVME705B transition card as follows:
mlusr> display link 1
¥
Use the following command to change the physical DTE/DCE
address:
mlusr> change link 1
Perform the following steps to configure the Host Link (link 1) on an
IPE Module as DCE or DTE.
¥
Log in as mlusr and verify that the physical DTE/DCE
configuration parameter matches the configuration on the CPU
adapter card in the IPE Module. (Use Procedure 15, ÒRemove the
IPE Module,Ó if necessary.)
mlusr>display link1
¥
Use the following command to change the physical DTE/DCE
address:
mlusr> change link 1
8
Verify link configuration with host computer configuration.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents