Nortel Meridian Meridian 1 Maintenance Manual page 213

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Diagnostic procedure 9
Printer faults (continued)
using an IPE Module?
Meridian Link Release 5C/CCR Release 3C Diagnostic and Maintenance Guide
This procedure applies to CCR only.
9.1
Is the system
YES
Replace the
IPE Module.
Chapter 4: Diagnosing faults 201
NO
Reseat the affected
MVME332XT(S) cards.
Replace the affected
MVME332XT cards. See
Procedure 11: Replace
the MVME332XT or the
MVME332XTS ACC card.
Replace the Application
Module. See Procedure
14: Replace the
Application Module.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents