Nortel Meridian Meridian 1 Maintenance Manual page 10

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

x
Contents
Procedure 5: Replace the Application Module power
supply
Procedure 6: Replace the Application Module disk/tape
unit
Procedure 7: Replace the Application Module
MVME147/167 SBC card
Procedure 8: Configure the Application Module MVME147
SBC card
Procedure 9: Configure the Application Module MVME167
SBC card or the IPE Module
Procedure 11: Replace the MVME332XT or
MVME332XTS ACC card
Procedure 17: Replace the Application Module MVME712
transition card
Procedure 18: Replace or reconfigure the Application
Module MVME705B transition card
Software reinstallationÑinitializing the system from tape
Procedure 19: Load the operating system tape on an
Application Module with an MVME147 card
Procedure 20: Load the operating system tape on an IPE
Module or an Application Module with an MVME167
card
Procedure 24: Restore configuration files and data files
from the backup tape
371
371
371
372
373
378
382
383
384
385
386
387
387
388
392
394
395
412
431
441
454
456
460
469
475

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents