Nortel Meridian Meridian 1 Maintenance Manual page 228

Application module and intelligent peripheral equipment module meridian link release 5c/ccr release 3c diagnostic and maintenance guide
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

216
Chapter 4: Diagnosing faults
553-3211-510 Standard 1.0 October 1998
12 For an Application Module, replace the MVME705B transition card,
using the following procedures:
¥
Procedure 3: Hardware powerdown
¥
Procedure 18: Replace or reconfigure the MVME705B transition
card
13 Start up the application by logging in as maint, typing
pressing [Return].
Redundant Meridian Link only
14 Manually switch the active link over to the standby link in LD 48. See
Chapter 12, ÒMeridian 1 configuration for Meridian Link/CCRÓ in the
Meridian Link/Customer Controlled Routing Installation and Upgrade
Guide (NTP 553-3202-210).
and
applstart

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents