Thermo Scientific Evolution 200 Series User Manual page 371

Uv-vis instruments
Table of Contents

Advertisement

Operation
Thermo Scientific
Locking screw
2. Lift the cell holder off the base.
To install the cell holder
1. Line up the cell holder with the two alignment pins on the cell changer base.
2. Hand tighten the two locking screws.
3. Initialize the accessory. See
Related Topics
Installing a Smart Cell Changer
Installation
Contents
Calibrating the Cell Changer
Initializing the Cell Changer
Cell Changer Settings
Measuring Samples with the Cell Changer
Displaying the Cell Changer Status Monitor
Related Topics
Safety Considerations
Operating Precautions
Initializing the Cell
Changer.
Smart Linear 8-Cell Changer
Cell holder
Locking screw
Base
Evolution 200 Series User Guide
25
357

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evolution 201Evolution 220Evolution 260 bio

Table of Contents