iMaster NetEco
Device Installation and Commissioning Guide (Data
Center)
Figure 3-14 Installing a smart U space manager (main control box attached to the
top of the cabinet exterior)
(1) Fastener
(4) Asset detection strip (42 U
detection point)
----End
3.6 Installing a UIM20A Expansion Module
Procedure
Step 1 Secure a mounting ear to each of the two sides of the UIM20A expansion module
using four M4 screws.
Issue 02 (2021-05-12)
(2) UIM20A Expansion Module (3) Main control box
Copyright © Huawei Technologies Co., Ltd.
3 Installing Devices
26