Pay attention to the negative and positive polarities of the power supply. If the
polarities are connected incorrectly, the device may be burned.
Figure 7-12 Connecting cables
(1) PE
(4) Output ports for
hydrogen sensor 1 to
hydrogen sensor 4
(7) RS485
Table 7-18 Pin mapping for the RS485 port
Pin
Pin 1 (orange-white)
Pin 2 (orange)
Pin 3 (green-white)
Pin 4 (blue)
Pin 5 (blue-white)
Issue 02 (2021-05-12)
D ANGER
Copyright © Huawei Technologies Co., Ltd.
(2) AC IN
(5) Hydrogen
concentration alarm
port, fan alarm port, and
hardware fault port
(reserved ports)
Signal
D+
D-
12V+
NC
NC
7 Device Maintenance
(3) Output ports for fan
1 to fan 4
(6) RS485+, RS485-,
GND, and idle ports
(reserved ports)
Function
RS485+
RS485-
12+ input
-
-