Huawei FusionModule2000-S User Manual

Huawei FusionModule2000-S User Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000-S:
Table of Contents

Advertisement

Quick Links

FusionModule2000-S Smart Modular Data Center
V100R021C10
User Manual
Issue
07
Date
2022-09-30
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FusionModule2000-S

  • Page 1 FusionModule2000-S Smart Modular Data Center V100R021C10 User Manual Issue Date 2022-09-30 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document About This Document Purpose This document describes the FusionModule2000-S smart modular data center in terms of the hardware installation, cable routing, installation inspection, power-on commissioning, and operation and maintenance (O&M), helping users systematically understand the installation, commissioning, and maintenance of the FusionModule2000-S smart modular data center.
  • Page 4 FusionModule2000-S Smart Modular Data Center User Manual About This Document Symbol Description Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury.
  • Page 5 FusionModule2000-S Smart Modular Data Center User Manual About This Document Issue Date Description 2021-07-15 Updated the content about the aisle mounting kit. 2021-05-27 Updated the content about the temperature and humidity (T/H) sensor. 2021-05-08 This issue is the first official release.
  • Page 6: Table Of Contents

    FusionModule2000-S Smart Modular Data Center User Manual Contents Contents About This Document........................ ii 1 Safety Information........................1 1.1 Personal Safety..................................2 1.2 Electrical Safety..................................3 1.3 Environmental Requirements.............................. 7 1.4 Mechanical Safety.................................10 1.5 Equipment Safety.................................. 14 1.5.1 UPS Safety....................................15 1.5.2 Cooling System Safety..............................16 1.5.3 Battery Safety..................................
  • Page 7 FusionModule2000-S Smart Modular Data Center User Manual Contents 3.5.1.3 (Optional) Installing a Horizontal Ground Bar....................54 3.5.1.4 (Optional) Installing a Vertical Ground Bar......................56 3.5.2 (Optional) Installing a PDF Tail Frame........................57 3.5.3 Installing a SmartLi Tail Frame............................. 59 3.6 Grounding a Cabinet................................61 3.7 Installing Aisle Components..............................62...
  • Page 8 FusionModule2000-S Smart Modular Data Center User Manual Contents 4.4 Connecting Cabinet Electronic Clasp Lock Cables....................125 4.5 Routing Power Cables for the PAD and WiFi Module................... 126 4.6 (Optional) Connecting IVS Cables..........................126 4.7 (Optional) Connecting rPDU Cables..........................127 4.8 (Optional) Cable Routes for a Smart Cooling Product PDB................128 5 Power-On Commissioning....................
  • Page 9 FusionModule2000-S Smart Modular Data Center User Manual Contents 5.3.8 Creating a Smart Module Plan View........................194 5.3.9 Commissioning the Smart Busbar..........................195 5.3.10 Commissioning Sensors.............................. 198 5.3.10.1 Commissioning a Smoke Detector........................198 5.3.10.2 Commissioning a WLD900 Water Sensor......................199 5.3.10.3 Commissioning a T/H Sensor..........................200 5.3.11 Commissioning Cabinet Electronic Clasp Locks....................
  • Page 10 5.3.16.3 Logging In to or Logging Out of the NetEco....................268 5.3.16.3.1 Operating Environment Requirements......................268 5.3.16.3.2 Logging In to the NetEco (Through Huawei Cloud)................. 271 5.3.16.3.3 Logging In to the NetEco (Through the WebUI)..................272 5.3.16.3.4 Logging Out of the NetEco..........................273 5.3.16.4 FAQs on Edge Data Center Management......................
  • Page 11 FusionModule2000-S Smart Modular Data Center User Manual Contents 6.3.9 Replacing Smart Cooling Product Parts........................309 6.3.10 Replacing a Smart ETH Gateway..........................310 6.3.11 Replacing a Pad................................310 6.3.12 Replacing a Cabinet Electronic Lock........................311 6.3.13 Replacing a Camera..............................312 6.3.14 Replacing an IVS1800..............................313 6.3.15 Replacing a Hard Disk for the IVS1800........................
  • Page 12: Safety Information

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information Safety Information Statement Before installing, operating, or maintaining the equipment, read this document, strictly follow the instructions provided herein, and follow all the safety instructions on the equipment and in this document.
  • Page 13: Personal Safety

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Damage caused during transportation by the customer or a third party authorized by the customer ● Storage conditions that do not meet the requirements specified in this document ●...
  • Page 14: Electrical Safety

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● If there is a likelihood of personal injury or equipment damage during operations, immediately stop, report the case to the supervisor, and take feasible protective measures. ● Do not power on the equipment before it is installed or confirmed by professionals.
  • Page 15 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information D ANGER Prevent foreign matter from entering the equipment during operations. Otherwise, equipment damage, load power derating, power failure, or personal injury may occur. WARNING For the equipment that needs to be grounded, install the ground cable first when installing the equipment and remove the ground cable last when removing the equipment.
  • Page 16 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits to telecommunication network voltage (TNV) circuits. ● If the equipment has multiple inputs, disconnect all the inputs before operating the equipment.
  • Page 17 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Ensure that the slots and holes for routing cables are free from sharp edges, and that the positions where cables are routed through pipes or cable holes are equipped with cushion materials to prevent the cables from being damaged by sharp edges or burrs.
  • Page 18: Environmental Requirements

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information Figure 1-1 Wearing an ESD wrist strap ● When holding a board or a module with exposed circuit boards, hold its edge without touching any components. Do not touch the components with bare hands.
  • Page 19 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information WARNING Install the equipment in an area far away from liquids. Do not install it under areas prone to condensation, such as under water pipes and air exhaust vents, or areas prone to water leakage, such as air conditioner vents, ventilation vents, or feeder windows of the equipment room.
  • Page 20 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information horizontal level of the site must be above the highest water level of that area in history. ● Before opening doors during the installation, operation, and maintenance of the equipment, clean up any water, ice, snow, or other foreign objects on the top of the equipment to prevent foreign objects from falling into the equipment.
  • Page 21: Mechanical Safety

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Personnel involving working at heights are not allowed to throw objects from the height to the ground, or vice versa. Objects should be transported by tough slings, hanging baskets, highline trolleys, or cranes.
  • Page 22 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information General Requirements ● Repaint any paint scratches caused during equipment transportation or installation in a timely manner. Equipment with scratches cannot be exposed to an outdoor environment for an extended period of time.
  • Page 23 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● When transporting the equipment using a forklift truck, ensure that the forks are properly positioned so that the equipment does not topple. Before moving the equipment, secure it to the forklift truck using ropes. When moving the equipment, assign dedicated personnel to take care of it.
  • Page 24 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● If a single ladder is used, ensure that the wider end of the ladder is at the bottom, and take protective measures to prevent the ladder from sliding. ●...
  • Page 25: Equipment Safety

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information Drilling Holes ● Obtain consent from the customer and contractor before drilling holes. ● Wear protective equipment such as safety goggles and protective gloves when drilling holes. ● To avoid short circuits or other risks, do not drill holes into buried pipes or cables.
  • Page 26: Ups Safety

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information 1.5.1 UPS Safety General Requirements NO TICE The category 3 (C3) UPS is intended for commercial and industrial application in the second class environment. Installation restrictions or additional measures may be needed to prevent interference.
  • Page 27: Cooling System Safety

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● To ensure power supply to loads during UPS upgrade, set the output to maintenance bypass mode. To avoid power failure or load damage, ensure that the bypass input is within the specified power supply range.
  • Page 28 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information D ANGER Do not expose batteries at high temperatures or around heat sources, such as high-temperature sunlight, fire sources, transformers, and heaters. Battery overheating may cause valve opening, deformation, leakage, fire, or explosions.
  • Page 29 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information D ANGER A lithium battery is an enclosed battery system and will not release any gases under normal operations. If a battery is improperly treated, for example, burnt, needle-pricked, squeezed, struck by a lightning, overcharged, or subject to other...
  • Page 30 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information WARNING After unpacking batteries, place them in the required direction. Do not place a battery upside down or vertically, lay it on one side, tilt it, or stack it. Ensure that the batteries do not fall or get damaged.
  • Page 31 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Batteries are damaged, fall, leak, or crack due to improper operations or incorrect connection. ● After being installed and connected to the system, the batteries are not powered on in time due to reasons attributed to the customer, which causes damage to the batteries due to overdischarge.
  • Page 32 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information special attention. For additional safety precautions, see the instructions provided by the battery manufacturer. ● Use batteries within the temperature range specified in this document. When the ambient temperature of the batteries is lower than the allowed range, do not charge the batteries to prevent internal short circuits caused during low- temperature charging.
  • Page 33 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information Leakage Handling NO TICE Electrolyte overflow may damage the equipment. It will corrode metal parts and boards, and ultimately damage the boards. Electrolyte is corrosive and can cause irritation and chemical burns. Should you come into direct contact with the battery electrolyte, do as follows: ●...
  • Page 34 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Do not store combustible materials in the battery room. Keep such materials at least 3 m away from the battery room. ● A battery room deployed outdoors should be at least 3.0 m away from the following places: restricted areas, combustible warehouses, dangerous goods, high-stacking warehouses, power infrastructure, public roads, and buildings.
  • Page 35 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● If a battery leaks or is damaged, contact technical support or a battery recycling company for disposal. ● If batteries are out of service life, contact a battery recycling company for disposal.
  • Page 36: Installation Preparations

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Installation Preparations 2.1 Preparing Tools and Instruments This section lists the tools and instruments required for installation. Table 2-1 General tools and instruments Tool Name, Specifications, and Appearance Protective gloves...
  • Page 37 FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Tool Name, Specifications, and Appearance Square Electrician's knife Impact tool Heat gun Needle-nose Diagonal pliers RJ45 crimping tool Insulation tape pliers Wire stripper Hydraulic pliers Wire clippers Crimping tool Multimeter...
  • Page 38 FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Table 2-2 Tools and instruments for smart cooling products Tool Name, Specifications, and Appearance Manual pallet truck Flashlight Hacksaw Electronic balance Antifreeze gloves Cutter Welding torch 5% silver welding rod...
  • Page 39: Installation Environment Check

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Tool Name, Specifications, and Appearance a. The pressure gauge and rubber hoses are dedicated for R410A. The measuring range of the pressure gauge must be at least 4.0 MPa, and the rubber hoses must withstand a pressure of at least 4.5 MPa.
  • Page 40 FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Check Item Required Specifications Check Result Equipment room ● Non-smart-busbar power □ Passed □ Failed net height distribution scenario: ≥ 2.6 m (without bases) ● Top support installation scenario for the smart busbar: –...
  • Page 41: Field Requirements

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations 2.3 Field Requirements NO TICE To prevent condensation, a dehumidifier must be installed in the equipment room when the dew point temperature is higher than 18°C (temperature: 18°C, humidity: 100% RH; temperature: 27°C, humidity: 57% RH).
  • Page 42: Reference Documentation

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Figure 2-2 Space requirements in the high-density HPC scenario 2.4 Reference Documentation Before installation, prepare the following documents in addition to this document. Table 2-4 Reference documents System Component Document Category PDU8000 Modular Precision PDC V2.0 User...
  • Page 43: Installation Scenarios

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations System Component Document Category (For Customer) iMaster NetEco Product NetEco Documentation (Data Center) (V600R022C10_01) (HDX)_EN FusionModule2000-S Smart Modular Data Others Center Quick Guide includes the following documents: FusionModule2000-S Smart Modular ●...
  • Page 44: Personnel Requirements

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Figure 2-4 Floor plan of the high-density HPC scenario Figure 2-5 PDF with an enclosure frame 2.6 Personnel Requirements Only trained and qualified personnel who fully understand basic safety precautions are allowed to perform the installation and operation.
  • Page 45 FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations CA UTION The relevant party will be liable for any consequence caused by the violation of this document. The requirements are as follows: ● Technical personnel from the customer must be trained and understand the installation and operation methods.
  • Page 46: Hardware Installation

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Hardware Installation 3.1 Moving and Unpacking 3.1.1 Moving and Unpacking a Smart Cooling Product NO TICE ● Only trained personnel are allowed to move the equipment. Use a pallet truck to move the equipment with its case down from the transportation truck.
  • Page 47: Moving And Unpacking Smart Module Components

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 3 Check the type and quantity of fittings against the packing list. If some fittings are missing or do not match the models in the packing list, record the information and contact the local office immediately.
  • Page 48: Moving The Pdf

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.1.3 Moving the PDF Context NO TICE ● Only trained personnel are allowed to move the PDF. Use a forklift truck to transport the PDF box secured to a wooden support to the installation position.
  • Page 49 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-1 Removing an L-shaped bracket Step 6 Raise the four leveling feet to the highest position using an adjustable wrench. Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 50: Moving An It Cabinet

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-2 Raising the leveling feet Step 7 Move the PDF over its castors to the installation position. NO TE If there are bases, place the PDF on the base.
  • Page 51 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-3 Removing bolts Step 3 Remove the cabinet from the pallet and place the cabinet in the installation position. NO TE If there is a base, place the cabinet on the base.
  • Page 52: Optional) Installing Bases

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.2 (Optional) Installing Bases Figure 3-4 Base installation drawing for the nine-cabinet scenario (unit: mm) 3.2.1 Precautions for Installing Bases To ensure that bases fit cabinet connecting structures, configure bases with different specifications for different cabinets.
  • Page 53: Installing Bases With Adjustable Dimensions

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation ● |L1–L2| ≤ 5 mm, |L3–L4| ≤ 5 mm Figure 3-5 Single-row base layout (unit: mm) 3.2.2 Installing Bases with Adjustable Dimensions Context Adjustable bases apply to PDFs, battery cabinets, IT cabinets, and smart cooling product cabinets.
  • Page 54 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Procedure Step 1 Adjust the base height. Measure the distance (H) between the concrete floor and the upper surface of the ESD floor using a ruler and record the value of H.
  • Page 55 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Tighten the bolt assemblies on the telescopic rod. Figure 3-8 Assembling a base Assemble the telescopic rod and the base, and then tighten the bolt assemblies. Step 3 Use a square to position the end cabinet base, and ensure that the outline of the upper surface of the base aligns with the cabinet bottom outline on the floor.
  • Page 56 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-9 Positioning the first base Step 4 Use the end cabinet base as the reference to place other cabinet bases. Step 5 Check that the installation position meets the requirements.
  • Page 57 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE If a base is not level, put washers under it, as shown by (2) in the following figure. Figure 3-11 Leveling a base Step 10 Tighten the expansion bolts, as shown by (3) in the preceding figure.
  • Page 58: Installing Cabinets

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-12 Connecting bases Step 13 Screw the floor holders to the bases, as shown by (2) in the preceding figure. ----End Follow-up Procedure Check the installation and ensure that adjacent bases are in close contact with each other and the gap is even.
  • Page 59 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-13 Cabinet layout diagram Procedure Step 1 Determine the cabinet positions based on the layout diagram. Step 2 Place all cabinets at the correct installation positions. Step 3 Level the cabinets using a wrench.
  • Page 60: Combining Cabinets

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-14 Leveling a smart cooling product cabinet (1) Level Step 4 Level other cabinets in the same way. ----End 3.4 Combining Cabinets Procedure Step 1 Level the cabinets using a wrench.
  • Page 61 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE ● Do not remove the anchor bolts. Otherwise, you need to rework them for use. ● Anchor bolt adjustment method: Wrench an anchor bolt clockwise to elevate a cabinet, or wrench an anchor bolt anticlockwise to lower a cabinet.
  • Page 62: Installing Cabinet Components

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-16 Combining cabinets ----End 3.5 Installing Cabinet Components 3.5.1 Installing IT Cabinet Components 3.5.1.1 (Optional) Installing Side Panels for IT Cabinets Context ● If IT cabinets are located at both the end and head of a row, install side...
  • Page 63 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-17 Installing side panels 1 (1) Side panels ● If a power supply and distribution equipment cabinet is located at the end of a row and an IT cabinet at the head of a row, install side panels only on the outer side of the head cabinet.
  • Page 64 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-19 Installing floating nuts Step 2 (Optional) Remove side panels based on the labels on the side panels to be adjusted. Step 3 Secure the side panels to the outside of the IT cabinet at the end of the row.
  • Page 65: Optional) Taking Out Rpdu Cables

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 4 (Optional) After adjusting side panels, remove the labels on the panels. ----End 3.5.1.2 (Optional) Taking out rPDU Cables Preparations Tools: diagonal pliers Procedure Step 1 Remove the rodent-proof mesh on the top of the rPDU in a cabinet, and take out the rPDU cables from the top.
  • Page 66 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-21 Removing M8 screws Step 2 Open the cabinet rear door, install the horizontal ground bar on the topmost position on the outside of the mounting bar, and secure the ground bar using the M8 screws removed earlier.
  • Page 67: Optional) Installing A Vertical Ground Bar

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.5.1.4 (Optional) Installing a Vertical Ground Bar Context Install the vertical ground bar in the IT cabinet closest to the PDF. Preparations Tool: Phillips screwdriver Material: vertical ground bar Procedure Step 1 Open the cabinet rear door and use four M4 screws to secure the vertical ground bar to the right mounting bar.
  • Page 68: Optional) Installing A Pdf Tail Frame

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-24 Installing a vertical ground bar ----End 3.5.2 (Optional) Installing a PDF Tail Frame The depth of the PDF and integrated UPS is 1100 mm. A tail frame needs to be added at the rear to expand the depth to 1350 mm.
  • Page 69 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-25 Securing the top beam Step 4 Use three M5x10 tapping screws to secure the enclosure frame to the bottom of the cabinet. Figure 3-26 Securing the enclosure frame to the bottom of the cabinet...
  • Page 70: Installing A Smartli Tail Frame

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.5.3 Installing a SmartLi Tail Frame Prerequisites The depth of the SmartLi is 850 mm. A tail frame needs to be added at the rear to increase the depth to 1350 mm.
  • Page 71 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-28 Installing a tail frame Step 4 Install PC panels at the rear of the SmartLi. Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 72: Grounding A Cabinet

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-29 Installing PC panels ----End 3.6 Grounding a Cabinet Cabinets are grounded by cables connected from the main ground bar to the nearby ground grid. Figure 3-30 M-shaped grounding Issue 07 (2022-09-30) Copyright ©...
  • Page 73: Installing Aisle Components

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.7 Installing Aisle Components NO TICE ● Aisle glass doors need to be installed and aisles need to be combined only in the 1600 mm deep cold and hot aisle containment scenario.
  • Page 74 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-31 Removing the chains, buckles, and connecting kits NO TE Perform this step for all cabinets except smart cooling product cabinets and IT cabinets. Step 3 Remove the upper and lower beams from the cabinet.
  • Page 75 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-32 Removing the upper and lower beams NO TE Perform this step for all cabinets except smart cooling product cabinets and IT cabinets. Step 4 Install the glass aisle door.
  • Page 76 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-33 Securing holes on the cabinet top Use three M5x10 tapping screws to secure the glass aisle door to the bottom of the cabinet. Figure 3-34 Securing the glass aisle door to the bottom of the cabinet Step 5 Install cabinet side sealing plates.
  • Page 77 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-35 Installing a side sealing plate Secure the side sealing plate from the outside. Use four M6x16 screw assemblies to secure the side sealing plate to the aisle door frame from the outside.
  • Page 78 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-36 Installing a side sealing plate Step 6 Secure the side sealing plates. Use four M5x10 tapping screws to secure a side sealing plate to the aisle door mechanical part on the inner side of the glass door near the cabinet, as shown in the following figure.
  • Page 79 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-37 Securing a side sealing plate Step 7 (Optional) Install the LCD on the front aisle door of the smart cooling product. Install the LCD on the reserved aisle door LCD mounting kit from the front of the aisle door.
  • Page 80: Combining Aisle Doors

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-38 Securing an LCD ----End 3.7.2 Combining Aisle Doors The aisle doors are combined in the same way as the cabinets. For details, see Combining Cabinets. 3.8 Installing Cable Troughs and Cable Racks 3.8.1 Installing Cable Troughs...
  • Page 81 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation ● Install two cable troughs on the top of the cabinet at the end of a row (PDF) first, and then install cable troughs on the top of other cabinets along the aisle in sequence.
  • Page 82 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-40 rPDU cable routing on the top of a cabinet (1) ELV cable trough (2) Electric cable trough Preparations Tool: Phillips screwdriver Materials: cable troughs and accessories Document: cable trough installation position diagram...
  • Page 83 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-41 Clamping a vertical plate Step 2 Rotate the vertical plate by 90 degrees to stand it on the top plate of the cabinet. Figure 3-42 Rotating the vertical plate by 90 degrees Step 3 Install the other vertical plate into the mounting holes in the second row counting from the front door to the rear door in the same way.
  • Page 84 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-43 Installing the other vertical plate Step 4 Press a supporting plate along the two vertical plates down to the place between the four clasps and the cable bridge. Ensure that the supporting plate is fully into the clasps.
  • Page 85 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-45 Installing a partition plate Step 6 Install adjacent cable troughs in the same way. Step 7 Rotate the interconnecting lever and clamp it into the clasps until the lever is horizontal.
  • Page 86: Installing An End Panel For A Cable Trough

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.8.2 Installing an End Panel for a Cable Trough Context ● Typically, end panels are installed only on cable troughs of cabinets at the two ends of an aisle. ●...
  • Page 87: Installing Rpdus

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.9.1 Installing rPDUs The rPDU needs to be installed behind the rear door of a cabinet. Procedure Step 1 Open the rear door of the cabinet and secure the rPDU on the right of the rear door.
  • Page 88: Optional) Installing Battery Cabinets Outside The Smart Module

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation (Integrated UPS 3.0) and UPS5000-E-(30 kVA-180 kVA) User Manual (Integrated UPS) . 3.9.3 (Optional) Installing Battery Cabinets Outside the Smart Module Battery cabinets are installed in the same way as other cabinets. The installation position depends on the design in the bidding phase.
  • Page 89: Optional) Installing Smartli Battery Modules

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 2 Unpack the lead-acid batteries. Step 3 Install lead-acid batteries on the lead-acid battery rack from the bottom up based on the lead-acid battery wiring diagram. NO TICE Due to space limitation, connect power cables after placing lead-acid batteries on one layer.
  • Page 90 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE In the scenario with a smart busbar or precision PDF, a power distribution box (PDB) needs to be installed to supply power to smart cooling products. The smart cooling product PDB weighs about 44 kg. It is recommended that the PDB be installed on a concrete wall with a thickness of at least 70 mm.
  • Page 91 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-50 Installation layout and space requirements for a smart cooling product PDB (1) Smart cooling product PDB (2) Smart module Figure 3-51 Wall-mounted installation of a smart cooling product PDB Issue 07 (2022-09-30) Copyright ©...
  • Page 92: Installing A Smart Busbar

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE The installation layout and space requirements for the smart cooling product PDB are for reference only and can be adjusted based on the actual situation of the equipment room.
  • Page 93: Installing An Electronic Clasp Lock

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE The M4 screw used for connecting the ground cable to the cable trough is available in the cable trough package. Step 3 Install the smart ETH gateway to the guide rail, as shown in Figure 3-52.
  • Page 94 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-53 Installing a round lock tongue (1) Round lock tongue NO TE ● To replace an electronic lock, remove the lock tongue on the door and the lock latch on the door frame post, and then replace the round lock tongue.
  • Page 95: Installing A Pad

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-55 Installing an electronic clasp lock (1) C-shaped lock slot (2) Electronic clasp lock (3) Intelligent lock mounting plate Figure 3-56 Installed electronic clasp lock NO TICE The positioning plate is only used to assist in determining the installation position of the electronic lock.
  • Page 96 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Preparations Tool: Phillips screwdriver Materials: PAD mounting support, PAD Procedure Step 1 (Optional) If the feet in the lower part of the PAD mounting support are not as wide as the PAD, adjust the feet, as shown in Figure 3-57.
  • Page 97: Securing The Pad Mounting Kit

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-58 Installing a PAD ----End 3.10.4 Securing the PAD Mounting Kit Preparations Tool: Phillips screwdriver Material: PAD mounting kit Procedure Step 1 Use three M5x10 tapping screws to secure the PAD mounting kit on the upper part of the end cabinet of the smart module, as shown in the following figure.
  • Page 98: Installing An Ecc800-Pro

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-59 Securing the PAD mounting kit ----End 3.10.5 Installing an ECC800-Pro Context Tool: Phillips screwdriver Materials: ECC800-Pro, floating nut Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 99 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-60 Equipment layout in the end IT cabinet Procedure Step 1 Determine the 42 U position for installing the ECC800-Pro in the end IT cabinet. Adjust the guide rail installation position and install floating nuts.
  • Page 100 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-62 Installing an ECC800-Pro Step 4 (Optional) Take out the ECC800-Pro main control module and install the MicroSD and SIM cards in the correct slots of the main control module as required.
  • Page 101: Installing A Lan Switch

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 5 Connect the ECC800-Pro power cable to the rPDU. ----End 3.10.6 Installing a LAN Switch Context The LAN switch needs to be installed in the front of the end IT cabinet, as shown Figure 3-60.
  • Page 102: Installing An Ivs1800

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE Two power modules need to be installed for a 24-port LAN switch onsite. ----End 3.10.7 Installing an IVS1800 Context By default, the IVS1800 is delivered without disks. After the IVS1800 is delivered to the site, install hard disks as required and then install the IVS1800 in the cabinet.
  • Page 103 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-69 Installing hard disks Insert the hard disk tray back at 45 degrees with the opening of its locking buckle facing downwards, hold the screw in the red-framed part to lower the hard disk tray until it is level, and fasten the black screws on the left and right sides and the white screw on the top.
  • Page 104 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-71 Connecting data and power cables to hard disks Close the chassis cover, and use a PH2 screwdriver to fasten the rear screws. Figure 3-72 Closing the chassis cover Step 2 Install the device.
  • Page 105 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-73 Installing a cage nut Install guide rails. Horizontally place a guide rail to the installation location through the positioning block at the front of the guide rail and the positioning hook at the rear of the guide rail.
  • Page 106 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-75 Installing a filler panel for guide rails Install the cage nuts that secure the IVS1800. The cage nut installation locations are the first and sixth holes along the guide rails, as shown in the following figure.
  • Page 107: Optional) Installing A Taishan 200 Server

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation the mounting ears on the front mounting bars of the cabinet, as shown in the lower right figure. Figure 3-78 Securing the device Step 3 Power on the device. Turn on the power switch.
  • Page 108 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-80 Installing a TaiShan 200 server Step 5 Connect the power cable to the TaiShan 200 server. Wear an ESD wrist strap or ESD gloves. Connect one end of the power cable to the cable port on the AC power module of the server.
  • Page 109: Optional) Installing A 2288X V5 Server

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-82 Securing the power cable Route the power cable along the cable tray neatly, use cable ties to bind the power cable, and use diagonal pliers to trim off the excess of the cable ties.
  • Page 110 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Place a guide rail horizontally at the installation position in the cabinet. Fix the guide rail using rubber plugs. In front of the guide rails: If a server is installed using the upper mounting holes, insert rubber plugs tightly into the holes at the middle.
  • Page 111: Installing A Camera

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-85 Connecting server power cables ----End 3.10.10 Installing a Camera Context Install the camera on the top of the front door of the end cabinet and ensure that the camera can monitor the entire front area of the smart module, especially the space for PAD operations.
  • Page 112 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-86 Removing the transparent cover Gently insert the SD card into the SD card slot. Figure 3-87 Installing an SD card Step 2 Align the mounting holes in the camera base with those in the camera mounting plate, and secure the camera to the mounting plate.
  • Page 113 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-88 Installing a camera base (1) Cable outlet Step 3 Use a Phillips screwdriver to loosen the screws on both sides of the lens, adjust the surveillance angle, and tighten the screws to 0.6 N·m.
  • Page 114 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE The camera features a three-axis design. The camera can be adjusted by –175° to +180° horizontally, and the lens can rotate –175° to +180° and be adjusted by 0° to 65° vertically.
  • Page 115: Installing Aisle T/H Sensors

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-91 Installing the camera mounting plate ----End 3.10.11 Installing Aisle T/H Sensors 3.10.11.1 Rules for Deploying T/H Sensors T/H sensors can be deployed in cold and hot aisles. Cold and Hot Aisle Containment ●...
  • Page 116 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-92 Cold and hot aisle containment scenario (number of cabinets ≤ 6) Figure 3-93 Cold and hot aisle containment scenario (6 < number of cabinets ≤ Figure 3-94 Cold and hot aisle containment scenario (number of cabinets > 12) Hot Aisle Containment ●...
  • Page 117: Installing T/H Sensors (33010516)

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-96 Hot aisle containment scenario (6 < number of cabinets ≤ 12) Figure 3-97 Hot aisle containment scenario (number of cabinets > 12) 3.10.11.2 Installing T/H Sensors (33010516) Context ●...
  • Page 118 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-98 Installing a T/H sensor Step 2 Set a device address for the T/H sensor. Operate the DIP switch on the T/H sensor to set the device address for the sensor.
  • Page 119: Installing Remote T/H Sensors For Smart Cooling Products

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-100 DIP switch settings for T/H sensors (hot aisle containment scenario) NO TE ● The figures are for reference only. The actual layout depends on the onsite configuration. ● The numbers 1–6 indicate the DIP switch settings of the T/H sensors.
  • Page 120: Installing T/H Sensors (33010516)

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE ● If the number of IT cabinets on both sides of the smart cooling product is the same, preferentially deploy the sensors on the left cabinet. ● If the number of IT cabinets on both sides of the smart cooling product is different, evenly deploy the sensors based on the actual situation of cabinets.
  • Page 121 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-103 Connecting a T/H sensor cable Step 2 Set the DIP switch on the T/H sensor. For details, see Table 3-3. Table 3-3 DIP switch settings on T/H sensors...
  • Page 122: Installing A Smoke Detector (33010293)

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation OUT port of one T/H sensor inside the cabinet to the IN port of the next T/H sensor outside the cabinet. Connect all T/H sensors in series in this way.
  • Page 123: Routing A Cable To A Wlds900 Water Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Configure two smoke detectors when the total number of cabinets is greater than 12 and less than or equal to 18. Attach the smoke detectors to the top panels at the rear of the seventh and last cabinets by magnet.
  • Page 124 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-105 Detector position (1) Water detector Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 125 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-106 Water sensor (1) Water detector (2) Conversion cable end A, (3) Conversion cable connected to the water detector (4) Conversion cable end B, (5) Water detection cable end...
  • Page 126 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation (1) Water leakage detector NO TICE Do not contact the water detection cable to metal, for this action will cause a false alarm. Take protective measures when routing a water detection cable.
  • Page 127 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-108 Removing the cover from the water detector Use two M3 screws to secure the bottom plate of the water detector to the bottom of the equipment, as shown in Figure 3-109.
  • Page 128 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-110 Connecting the cables (1) Conversion cable end B, connected to the (2) Water detection cable end A, connected to water detection cable the conversion cable NO TE The water detection cable and conversion cable are interconnected through male and female connectors.
  • Page 129 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-112 Installing a fastener Step 7 Place the water detection cable onto the fasteners, secure the fasteners, and keep the water detection cable in close contact with the floor, as shown in Figure 3-113.
  • Page 130: System Cabling

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling System Cabling 4.1 System Cabling Rules Attaching Cable Labels Find the corresponding cable based on the wiring diagram in the cable fitting bag, and attach the corresponding cable label taken out from the cable fitting bag to both ends of the cable by wrapping the ends.
  • Page 131 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-1 Neatly organizing cables Keep a large number of cables neat and appealing in the network cabinet by using cable organizers. Move the excess parts of cables in unnoticeable positions.
  • Page 132 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-3 Binding cables in different colors Cable Spacing Requirements Comply with the following requirements if possible to lay out different types of cables: Separate AC and DC power cables from diverse non-shielded signal cables.
  • Page 133 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling If a number of wire terminals are connected to a multi-point connector, provide slack and arrange them neatly to prevent stress on certain wires, as shown in Figure 4-5. Figure 4-5 Cable connections Protect cable holes in a metal kit with grommet strips.
  • Page 134 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-6 Cutting off the excess part of a cable tie Do not use cable ties at a place where the cables are bent. Otherwise, the cable cores may break due to strong stress, as shown in Figure 4-7.
  • Page 135: Installing Smart Busbar Cables

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling 4.2 Installing Smart Busbar Cables For details, see the documents delivered with the equipment, the documents NMW Smart Busbar 2.0 User Manual . obtained by scanning the QR code, or 4.3 Connecting a Monitoring Cable to the Smart ETH...
  • Page 136: Connecting Cabinet Electronic Clasp Lock Cables

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Step 3 Connect the FE_2 port on the smart ETH gateway to the LAN_2/POE port on the ECC800-Pro using a network cable. ----End 4.4 Connecting Cabinet Electronic Clasp Lock Cables Prerequisites The cabinet electronic clasp locks have been installed.
  • Page 137: Routing Power Cables For The Pad And Wifi Module

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling 4.5 Routing Power Cables for the PAD and WiFi Module Prerequisites The PAD and PAD power cable have been installed. Context NO TE The PAD is installed at the end of a row. When the PDF is deployed inside the row, the PAD power cable needs to be connected to the PAD through the PDF.
  • Page 138: Optional) Connecting Rpdu Cables

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Procedure Step 1 Connect one end of the ground cable to the ground terminal on the device and the other end to the ground point on the cabinet. A Phillips screwdriver and M4 screws are required.
  • Page 139: Optional) Cable Routes For A Smart Cooling Product Pdb

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Procedure Step 1 Connect the rPDU cables. NO TICE rPDU cable connections depend on the rPDU type and wiring port silk screen. Figure 4-13 Connecting rPDU cables Step 2 Route the rPDU cables through the cable hole in the attachment plate of the side ear and connect the cables to the AC Input1 power port on the ECC800-Pro.
  • Page 140 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling ● Connect one end of two communications cables of the smart cooling product PDB to the RS485+ port and RS485– port respectively, and the other end of the two communication cables to the COM3 port on the ECC800 respectively.
  • Page 141: Power-On Commissioning

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Power-On Commissioning 5.1 Power-On Commissioning for the Power Supply and Distribution System 5.1.1 Commissioning the Power Supply and Distribution System in the Integrated UPS Scenario 5.1.1.1 (Optional) Commissioning the ATS Before Power-On...
  • Page 142 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 5 Press the locking latch on the ATS panel, pull out the handle, and insert it into the slot. Step 6 Check the ATS Motor/Manual selection lever, and flip it to the Motor (M) mode.
  • Page 143 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Item Values Description Generator Usage No Generator; The default value is No Generator In Use Generator. Set the parameter based on site requirements. Line Priority Line 1-Switch I; Line 2- The default value is Switch II;...
  • Page 144: Power-On

    Service Expert app. Skip this step if the UPS is not powered on for the first time. ● The Service Expert app can be downloaded from HUAWEI AppGallery and can only run on Android. 5.1.1.3.1 Obtaining the Startup Password Prerequisites You have installed Service Expert app and registered with the app.
  • Page 145 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 On the app home screen, tap StartUp to access the Set Startup screen. Step 2 Set Site and Device Type based on the site requirements and tap Start Check.
  • Page 146: Settings Wizard

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.1.1.3.2 Settings Wizard Procedure Step 1 Set the language, time and date, network parameters, system parameters, and battery parameters on the Settings Wizard screen. NO TICE Set system parameters with caution because the settings determine whether the UPS can operate normally.
  • Page 147 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-1 Settings Wizard NO TE ● Set the time and date correctly. Incorrect time and date will cause false fault analysis during maintenance or repair, affecting the normal operation.
  • Page 148: Starting The Inverter

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 3 If the system has connected to the remote EPO switch, choose System Info. > Settings > System Settings and set EPO detection to Enable. Step 4 View the system running diagram on the LCD to check that the UPS is working in bypass mode.
  • Page 149: Optional) Setting The Bsc Mode

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TICE After the UPS is started for the first time, perform a battery capacity test to ensure that battery parameters are correctly displayed. Step 3 (Optional) Switch on the lighting output circuit breaker in the integrated UPS and check whether the PWR indicator on the FusionModule actuator lights up.
  • Page 150 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-2 Standard BSC mode Step 2 Set the BSC master system. On the LCD of one UPS, choose System Info > Settings > System Settings and set BSC master/slave mode to BSC master system.
  • Page 151: Powering On The Smartli

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.1.1.7 Powering On the SmartLi Prerequisites ● Turn on the ready switch on the BCU. ● Ensure that the UPS runs stably in normal mode and the rectifier in the energy flow diagram is started.
  • Page 152 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TICE ● The BCB off alarm (the red indicator is steady on) is displayed on the SmartLi LCD. No action is required. After the battery circuit breaker is switched on, the alarm is automatically cleared.
  • Page 153 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-5 System Param. Item Description Default Value Range Value Battery cabinet Total number of battery 1–15 quantity cabinets. Charging mode Mode 1 can meet the Mode 1 Mode 1, Mode 2 requirements of most customers.
  • Page 154 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Item Description Default Value Range Value Battery If this parameter is set to Disable Disable, Enable overcurrent Disable, no alarm is (discharge) reported when battery overcurrent occurs during discharging. If this parameter is set to...
  • Page 155: Commissioning The Power Supply And Distribution System In The Integrated Pdf Scenario

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning breaker on the SmartLi where the BCU blinks at super short intervals one by one. ----End 5.1.2 Commissioning the Power Supply and Distribution System in the Integrated PDF Scenario Context The IT route of the integrated PDF is powered by the UPS outside the smart module.
  • Page 156 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TICE ● Check that the MDU screen displays information properly and communicates properly. ● After the first login, change the password in time to improve account security and prevent unauthorized network attacks, such as data tampering. The relevant party will be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 157: Powering On The System (Precision Pdf)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 10 (Optional) Switch on the lighting output circuit breaker in the integrated PDF and check whether the PWR indicator on the FusionModule Actuator (or AC actuator) lights up. Press the lighting button to power on the lights.
  • Page 158 – After the first login, change the password in time to improve account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 159 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Perform quick settings. Table 5-10 Settings Wizard Item Parameter Setting Language Set as required. Data and Date format Set as required. Time YYYY-MM-DD Actual date Time zone Actual time zone...
  • Page 160: Commissioning The Power Supply And Distribution System In The Smart Busbar Scenario

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.1.4 Commissioning the Power Supply and Distribution System in the Smart Busbar Scenario Context The smart busbar is powered by the UPS outside the smart module. Smart cooling products and lights are powered by the PDB.
  • Page 161: Commissioning A Smart Rpdu

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE ● When switching on an output circuit breaker, check whether the mapping between the circuit breaker and the downstream device is consistent with that in the design drawing.
  • Page 162 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Model Name Output Eleventh and Displayed on Port Twelfth Number the WebUI Characters in Device Barcode ZZIF-130-2004 20 x C13 2123126 + 4 x C19 PN1-32I15-20E4 20 x C13 2122936...
  • Page 163 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-6 PDU2000-M (C) initialization screen – Press MENU to enter the device communications address screen. Figure 5-7 PDU2000-M (C) communications settings – Set a unique address by pressing DOWN and UP.
  • Page 164 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning – Press MENU again to access the device communications address screen. Figure 5-8 PDU2000-M (H) communications settings – Set a unique address by pressing BUTTON. – Press MENU. The LCM screen changes to , indicating that the address setting is complete.
  • Page 165: Power-On Commissioning For The Cooling System

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Path Parameter Setting Communicati COM1/COM2 ons Port Enter the actual device address of the Device PDU2000. Address Click Test Connect to check whether the PDU2000 connects to the ECC800- Pro properly.
  • Page 166 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning System User Preset Password Permission Description admin 000001 Can set all the menus. (administrator) operator (common 000001 Can only view parameters and set user) some parameters. NO TICE ● User operator can access customer and delivery parameters. The parameters on the Advanced menu are delivery parameters.
  • Page 167 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Select Language Specifies the display language. Language Date and Date format Specifies the date format. Time Settings Date settings Specifies the date. Time zone Specifies the time zone.
  • Page 168 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Cold aisle This function can be enabled only temperature and when at least one smart cooling humidity sharing product in the teamwork group is equipped with cold aisle T/H sensors. If...
  • Page 169 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Smart diagnosis ● Enable: If there is an intelligent function temperature control monitoring board, this function is enabled to start refrigerant status detection. ● Disable: The smart diagnosis function is disabled.
  • Page 170 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Heating function ● Enable: The device starts humidifying when the ambient temperature is lower than the temperature setpoint by a certain range. ● Enabled when active power supply...
  • Page 171 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Humidifying function ● Enable: The device starts humidifying when the ambient humidity is lower than the humidity setpoint. ● Enabled when active power supply is working: The device starts...
  • Page 172 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description DO_2 ● If this parameter is set to Smoke & Water only, DO_2 acts according to DO_2 action when a smoke or water overflow alarm is generated. ● If this parameter is set to Critical...
  • Page 173 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Floor water overflow Set the action of the device if there is alarm action water overflow on the floor based on the actual scenario. ● Shutdown: The device shuts down when a floor water overflow alarm is generated.
  • Page 174: Setting Parameters

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Humidity setpoint After the temperature and humidity control type and the humidity value under this type are set, the device performs regulation based on the settings. 40%–60% is recommended.
  • Page 175 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-12 T/H Sensor Paramete Description Recommended Value Temperat When the application scenario is Cold aisle ure and non-aisle containment, you are humidity advised to choose Return air. control Choose Cold aisle if cold aisle T/H type sensors are installed.
  • Page 176: Optional) Setting Teamwork Parameters

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Paramete Description Recommended Value Cold aisle Enables or disables a sensor. sensor Hot aisle Enables or disables a sensor. sensor 5.2.2.2 (Optional) Setting Teamwork Parameters Setting Teamwork Parameters Path: Teamwork > Teamwork Settings...
  • Page 177 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Enable teamwork If CAN network is selected, set Enable teamwork CAN resistor CAN resistor to Yes for the first and last units. If Enable teamwork CAN resistor is set to No for the...
  • Page 178 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Requirement control Indicates whether to enable or disable the requirement control function on the master unit. ● When Requirement control is set to Disable, the master unit does not synchronize operating data to...
  • Page 179 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-14 Teamwork topology Item Note On/Off ● On: The device is started. ● Off: The device is shut down. 01/02/03... Indicates the device address. The smallest address is for the master unit and the rest are for slave units.
  • Page 180: Setting Tcp Communication Parameters

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Follow-up Procedure After you have completed the teamwork settings, perform the following checks to confirm whether the teamwork networking is successful: Step 1 Check whether the number of devices in the topology is the same as the actual number of devices.
  • Page 181: Startup

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Link mode Set this parameter to Server. Server encryption Set this parameter to Enable. ----End 5.2.3 Startup Initial Startup NO TICE ● Before startup, ensure that you have downloaded the Service Expert app from the app store and applied for the permission to use the app.
  • Page 182 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-18 Startup authorization Step 2 Open the Service Expert app, tap Startup Commissioning > Offline Activation on the home screen to generate a startup password. Figure 5-19 Offline activation ●...
  • Page 183: Charging The Remaining Refrigerant

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Non-initial Startup Step 1 Tap Start on the home screen. ● If the Require password to start or shut down onsite function is enabled, enter the login password to start the device.
  • Page 184 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-23 Charging refrigerant (without a low temperature component) (1) Electronic balance (2) Refrigerant cylinder (3) Pressure gauge (4) Connection nut (5) Low-pressure needle (6) Exhaust pipe needle valve valve ●...
  • Page 185: Wizard Startup

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Outdoor Normal Normal Suction Normal Suction Ambient Discharge Pressure Range Superheat Temperature Pressure Range Degree Range 35–45°C 2.5–3.8 MPa > 45°C 3.1–4.15 MPa If the suction pressure, discharge pressure, and suction superheat degree are not within the normal ranges, check the following items: Refrigerant has been charged as required.
  • Page 186 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-25 Wizard Startup NO TE ● For the initial wizard startup, Last Record is in gray, indicating that operation is not allowed. ● For a non-initial wizard startup, you can choose Last Record to view the last wizard startup report.
  • Page 187: Optional) Power-Off

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-27 Measuring the current ----End 5.2.6 (Optional) Power-Off Step 1 Tap Shutdown on the home screen. Step 2 Turn off the active power switch QF1 and standby power switch QF2.
  • Page 188: Preparations And Webui Login

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.3.1 Preparations and WebUI Login Prerequisites ● Supported operating system: Windows 7 and later versions ● Recommended screen resolution: 1366 x 768 or higher ● Browser: Chrome, Firefox, Internet Explorer 11 or later...
  • Page 189 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE ● If the ECC800-Pro connects to a LAN and a proxy server has been selected, perform Step Step 3.4. ● If the ECC800-Pro connects to the Internet, and the PC in a LAN accesses the Internet over a proxy server, do not perform Step 3.3...
  • Page 190 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-29 Adding an address Enable file download and set the security level of the trusted site to low. Figure 5-30 Setting parameters NO TE When switching between different versions of the ECC800-Pro on your PC, you are advised to clear the historical Internet Explorer cache.
  • Page 191: Preparations And App Login

    You have obtained the IP address of the ECC800-Pro as well as the user name and password for WebUI login. Procedure Step 1 Download and install the FusionModule app from Huawei AppGallery. Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 192 Before the installation, ensure that the PAD is connected to the Internet and the network is running properly. ● Huawei AppGallery installed on the PAD Log in to the Huawei AppGallery client, search for FusionModule, and tap Install. Huawei AppGallery is preinstalled on Huawei PAD by default. ● Huawei AppGallery not installed on the PAD...
  • Page 193 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE ● The preset password is Changeme. The password is valid only after you hold down the button for the first time to enable the WiFi function. If you enable the WiFi function on the WebUI, there is no preset password.
  • Page 194: Optional) Cloud Service Access

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE – After the first login, change the preset password in time to ensure system access security. – A password that has been used for a long time is more likely to be stolen or cracked.
  • Page 195: Facial Recognition

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning the mobile data is Enable and the gateway address type is Domain name. Table 5-15 NetEco parameters Parameter Settings Name Address type Domain name. NetEco domain This parameter is set by default.
  • Page 196: Maintaining The Facial Data

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-33 Recording facial data Table 5-16 Facial data to be recorded Item Function Tap this icon to start recording facial data. Select the access actuator associated with the facial data.
  • Page 197: Commissioning Configuration Wizard

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-17 Facial recognition management functions Operation Purpose Modify the access actuator associated with the user. Delete the facial data. Step 4 Tap OK. ----End 5.3.5 Commissioning Configuration Wizard Context ●...
  • Page 198: Configuring Event Notification

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.3.6 Configuring Event Notification You can set alarm notification by email or SMS as required. Information about a maximum of 20 users who will receive alarm notification can be displayed.
  • Page 199 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-34 Email setting page NO TE The following email addresses are for reference only (the actual parameters apply) and are used only for configuring the email function. Table 5-18 Main parameters on the outbox configuration page...
  • Page 200 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Email Email Mailbox Server Encryption Remarks Type Server IP Address Mode and Domain SMTP port Name ● If the email Hotmail smtp- TLS encryption: type is not mail.outloo in the list, k.com...
  • Page 201 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE The mobile phone number is used only for configuring the SMS function and is not used for other purposes. The phone number is encrypted during transmission in the ECC800-Pro to ensure that the personal data of users is fully protected.
  • Page 202 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-38 Adding alarm notification NO TICE Mailbox Address in Alarm Notification can be selected after it is added in Mailbox Settings. Mobile Phone Number can be selected after it is added in SMS Settings.
  • Page 203 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Type Error Code Suggestion Check whether the IP address corresponding to the domain name of the email server is configured. 1. Check whether the IP address of the DNS server is correct.
  • Page 204: Setting The Date And Time

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Type Error Code Suggestion Failed to send Check whether the outbox address matches the test email. the user name for logging in to the email server. 1. Log in to the email box of the email sender and start the SMTP service.
  • Page 205: Creating A Smart Module Plan View

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 Choose System Settings > System Parameters > Time. Step 2 Set the time zone, date, and time, or click Obtain Local Time. Then, click Submit. Step 3 (Optional) If you want to use the NTP server for time synchronization, select NTP server sync.
  • Page 206: Commissioning The Smart Busbar

    Step 3 Go to the ECC running parameter page, click Unhide All Advanced Signals, and select Other Parameters. Set Smart module scenario to FusionModule2000-S and click Submit. Figure 5-41 Setting the smart module scenario ----End 5.3.9 Commissioning the Smart Busbar...
  • Page 207 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning general input units and power distribution units properly connect to the ECC800-Pro, the ECC800-Pro automatically identifies the units. ● Then, you need to set parameters for the general input units and power distribution units;...
  • Page 208 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-21 Power distribution settings for a power distribution unit Path Parameter Name Default Description Value Monitoring > QF1 Rated current (L1) Rated current 32 A for Power each branch.
  • Page 209: Commissioning Sensors

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-42 Networking settings ----End 5.3.10 Commissioning Sensors 5.3.10.1 Commissioning a Smoke Detector If a smoke detector is installed, perform the following steps to configure it. Context If the sensor is preinstalled, only check its settings.
  • Page 210: Commissioning A Wld900 Water Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-22 Function commissioning Check Method Normal Connection Status Alarm Clearance Method Simulate a Smoke DI alarm is displayed Disconnect the smoke smoky on the active alarm page of detector cable and reconnect environment the app or WebUI.
  • Page 211: Commissioning A T/H Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 2 Check the function of the water sensor. Table 5-23 Check Method Normal Connection Alarm Clearance Status Method Immerse the water Leak DI alarm is Wipe dry the water detection cable in water.
  • Page 212 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE ● The numbers 1–6 indicate the DIP switch settings of the T/H sensors. ● After the addresses are set, power on the device, choose Settings > System Settings >...
  • Page 213: Commissioning Cabinet Electronic Clasp Locks

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning – If the connection succeeds, click Confirm. The device connection information is displayed in the Number of connected devices list. – If the connection fails, check whether the device is properly connected to...
  • Page 214 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning even-numbered cabinet, and the other end of the cable is connected to the COM3 port on the ECC800-Pro. ● The smart module view has been set. ● The cabinet door can be opened and closed properly. If the cabinet door cannot be opened and closed properly, adjust the position of the cabinet electronic clasp lock by performing Steps 1 and 2.
  • Page 215 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Address Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6 NO TE The DIP switch of a cabinet electronic clasp lock should be set to the reverse of the binary value of the corresponding address.
  • Page 216 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-28 Adding a cabinet electronic clasp lock Path Parameter Setting Name Choose System Settings Device Cabinet electronic clasp lock > Device Management Attribute and click Add Device. Device Type...
  • Page 217 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Function Path Operation Remotely Choose Click the Select Open front door or Open open a Monitoring > Controls tab. back door from the Cabinet cabinet Cabinet > IT door control drop-down list box, electroni Cabinet101a.
  • Page 218: Video Management

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-47 Adjusting the installation position Check whether there is interference between the castors and the door sill at the bottom of the cabinet. If they interfere with each other, remove the fastener that secures the castors.
  • Page 219: Reference Documentation

    Before commissioning a camera, prepare the following documents in addition to this document. Table 5-30 Commissioning documents Component Document C3220-10-SIU Huawei C Series SDC 9.0.0 Product Documentation IVS1800 IVS1800 9.1.0 Product Documentation iClient S100 User Manual 5.3.12.2 Networking Scenarios Smart ETH Gateway Networking Scenario ●...
  • Page 220: Commissioning Cameras (Lan Switch Networking Scenario)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning LAN Switch Networking Scenario If there are multiple IVS1800s for multiple smart modules, you are advised to evenly distribute the cameras to each IVS1800. Figure 5-50 Camera + IVS1800 connecting to the LAN switch 5.3.12.3 Commissioning Cameras (LAN Switch Networking Scenario)
  • Page 221 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE – To prevent security risks, the system prompts you to set the password of the admin user when you log in to the system for the first time.
  • Page 222 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Settings Procedure Enable TLS 1.1 and TLS 1.2. NOTE You must enable TLS 1.1 and TLS 1.2 when the HTTPS protocol is used to access the camera. Otherwise, the camera WebUI cannot be opened.
  • Page 223 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-51 Setting the IP address Table 5-32 IP address parameters Parameter Description IPv4 address Method for obtaining the IP address. The options are assignment Obtain IP address automatically and Use the following IP address.
  • Page 224 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-52 Setting primary stream parameters Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 225 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-53 Setting secondary stream 1 parameters Table 5-33 Video stream parameters Parameter Description Primary stream/ Set the stream type based on the site requirements. Secondary – Primary stream: The primary streams feature high stream bit rate, definition, and bandwidth consumption.
  • Page 226 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Intelligent After intelligent encoding is enabled, a camera can encoding automatically adapt to scenarios to reduce the bit rate and save the storage space. A higher intelligent encoding level indicates more significant reduction of the bit rate, which however may lead to image quality deterioration.
  • Page 227 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Bit rate type This parameter is available only when you set Encoding protocol to H.264 or H.265. The bit rate is measured by data bits transmitted in a unit of time.
  • Page 228: Commissioning A C3220 Camera (Sd Card Configured)

    If the VCN or IVS1800 is not configured and an SD card is chosen, perform the following procedure. Procedure Step 1 Log in to the Huawei camera WebUI. Configure the PC IP address and the camera IP address in the same network segment. Enter the camera IP address (192.168.0.120 by default) in the address bar of the Internet Explorer and press Enter.
  • Page 229 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-54 Setting the IP address of the camera Format the SD card. Choose Settings > System Configuration > Storage Management. The Storage Management page is displayed. Format the SD card.
  • Page 230 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-55 Setting audio and video parameters NO TE If longer-time video storage is required, set camera parameters according to the following table. Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 231 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-34 Camera configuration parameters Condition Result Encoding Resolutio Frame I-Frame Minimum Supporte Protocol Rate Interval Bit Rate d Video Required Storage Duration H.265 1080P 1 Mbit/s H.264 1080P 1 Mbit/s H.265...
  • Page 232: Commissioning Cameras (Smart Eth Gateway Networking Scenario) (C10)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-57 Configuring the alarm linkage policy ----End 5.3.12.4 Commissioning Cameras (Smart ETH Gateway Networking Scenario) (C10) 5.3.12.4.1 Commissioning a C3220 Camera Prerequisites ● If multiple cameras are connected, commission one camera first and then commission other cameras in the same way.
  • Page 233 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-35 IP address planning Device Internal IP Address External IP Address Camera Example: 192.168.248.50; range: Camera external IP 192.168.248.50–192.168.248.199 address NOTE The 192.168.246.X network segment cannot be set. VCN/ Example: 192.168.248.51;...
  • Page 234 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE – To prevent security risks, the system prompts you to set the password of the admin user when you log in to the system for the first time.
  • Page 235 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Settings Procedure Enable TLS 1.1 and TLS 1.2. NOTE You must enable TLS 1.1 and TLS 1.2 when the HTTPS protocol is used to access the camera. Otherwise, the camera WebUI cannot be opened.
  • Page 236 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-59 ONVIF parameters Remove the network cable from the PC to the PoE port on the ETH gateway. Connect the PC to the LAN1 port on the ECC800-Pro using a network cable, and reconnect the network cable between the smart ETH gateway and the LAN2 port on the ECC800-Pro.
  • Page 237 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-60 Clicking the camera access link Choose Settings > Network > TCP/IP, set Way to obtain IPv4 to Use the following IP address and set an IPv4 address to the planned IP address for the camera.
  • Page 238 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning ● Video Type: Select the video type based on the customer's device. ● Link: Enter the external IP address of the camera (for example, https:// external IP address of the camera ).
  • Page 239 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 6 For details about how to commission the camera and set parameters, see the documents delivered with the device or the documents obtained by referring to the section "Preparing Documentation".
  • Page 240 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-65 Setting primary stream parameters Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 241 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-66 Setting secondary stream 1 parameters ----End Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 242: Commissioning A C3220 Camera (Sd Card Configured)

    If the VCN or IVS1800 is not configured and an SD card is chosen, perform the following procedure. Procedure Step 1 Log in to the Huawei camera WebUI. Step 2 Format the SD card. Choose Settings > System Configuration > Storage Management.
  • Page 243 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-67 Setting audio and video parameters NO TE If longer-time video storage is required, set camera parameters according to the following table. Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 244 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-37 Camera configuration parameters Condition Result Encoding Resolution Frame I-Frame Minimum Supported Protocol Rate Interval Bit Rate Video Required Storage Duration H.265 1080P 1 Mbit/s H.264 1080P 1 Mbit/s H.265...
  • Page 245: Commissioning A Network Video Recorder (Ivs1800 Scenario)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-69 Configuring the alarm linkage policy ----End 5.3.12.5 Commissioning a Network Video Recorder (IVS1800 Scenario) 5.3.12.5.1 Setting Parameters on the IVS1800 WebUI Context A default IP address has been configured for the IVS1800 before delivery. Modify the IP address based on the actual network plan.
  • Page 246 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning IP address indicates the IP address of the IVS1800. In the URL, NO TE The OMU portal supports Internet Explorer 10.0 and later versions. Step 3 Log in to the OMU portal. Set the service system and operating system passwords at the first login.
  • Page 247 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Name Description NON-RAID – Each recording file is stored on only one hard disk. The disk usage is high, but the data storage reliability is lower than that in RAID 5 mode.
  • Page 248 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 6 Configure NAT on the IVS1800. (1) Configure the MU: Choose Maintenance > Unified Configuration, set Module Name to MU, and click Search. Click Edit in the record where the value of Parameter Name is MUNNatIP, set the external IP address of the IVS1800, and click Save.
  • Page 249 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Click Edit in the row where the value of Parameter Name is SDKNatIP and set Value to the NAT-mapped IP address configured on the firewall. Click Save. Click Edit in the row where the value of Parameter Name is SDKNatPort and set Value to the NAT mapped port number configured on the firewall.
  • Page 250 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-40 Parameter description Parameter Setting The NTP clock source server Indicates whether the NTP clock source server is specified for time synchronization. ● Select Yes if an NTP server is configured onsite.
  • Page 251: Setting Parameters On The Iclient S100

    Select iClient S100 in the search result to download the installation package. NO TE – Use your mobile number to register a Huawei Cloud account, complete real-name authentication, and then log in to the HOLOWITS. – Before installing the iClient S100, you are advised to disable the antivirus software installed on your computer or preinstalled on the Windows operating system, to prevent environment check failures.
  • Page 252 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-41 Installation modes Installation Scenario and Restriction Mode Server+Client ● An iClient S100 system requires at least one iClient S100 server. ● When only one client is required for service configuration and operations, you only need to complete the installation in this mode.
  • Page 253 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 9 A message is displayed at the end of installation, asking whether to restart the computer immediately (the default option is Yes). If Yes is selected, after you click Finish, the computer automatically restarts to complete the installation.
  • Page 254 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Remember If you select this option, the password of the user used for the last password login is saved. Forgot If you have bound your account to an email address, you can password retrieve your password using your email address.
  • Page 255 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter/Button Description Port Specifies the device port. The default port number is 18531. User Name ● You are advised to create a user to access the iClient S100. For details, see 1.
  • Page 256: Linkage Control

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 16 Set the camera type. Choose System Management > Devices > Device Management > Micro Edge. Select an IVS1800. Right-click the camera for which you want to set the intelligent attribute and choose Configure from the shortcut menu.
  • Page 257 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning ● In this example, the fire controller connects to port AI/DI_3. The actual port may vary. Procedure Step 1 Install cables between the fire controller and ECC800-Pro. Figure 5-77 Installing cables between the fire controller and ECC800-Pro Step 2 Log in to the ECC800-Pro WebUI as an administrator.
  • Page 258: Neteco Management

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE After the corresponding AI/DI device is enabled, the AI/DI device type must be consistent with the DO state. Table 5-45 Fire sensor NO and NC definitions Item Definition Dry contact signal for the fire sensor abnormality alarm.
  • Page 259: Setting Neteco Parameters

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 1 Loosen the screws on both sides of the panel of the ECC800-Pro main control module. Step 2 Pull the handles on both sides of the panel of the ECC800-Pro main control module to remove the module.
  • Page 260 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 Apply for a fixed IP address to the equipment room network administrator. Step 2 Set ECC800-Pro communications parameters. ● (WAN port networking) On the ECC800-Pro WebUI, set the IP address, subnet mask, and default gateway, and click Submit.
  • Page 261 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-48 Management system parameters Path Parameter Default Setting Value System Server IP 192.168.8. IP address of the primary Settings > management system server NOTE Application The management system IP address >...
  • Page 262: Obtaining The Neteco Software License

    Obtain the license from the technical support website. ● For enterprise users: Log in to the technical support website at https://support.huawei.com/ enterprise. Browse or search for iMaster NetEco License Application Guide, and apply for the license of the NetEco software by referring to the guide.
  • Page 263: Powering On A Server

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning iMaster NetEco V600R022C00XXX Version Mapping (Data versions in the Center) . ● For carriers: Log in to the iMaster NetEco technical support website. Obtain the iMaster NetEco V600R022C00XXX ReleaseDoc_EN (Data Center).zip and DP_V600R022C00XXX_XXAdapters.zip packages,...
  • Page 264: Logging In To The Neteco Client

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE After the server is started properly, the button/indicator of its power switch is displayed green. Figure 5-81 Power button on the 2288X V5 server Figure 5-82 TaiShan 200 server power button ----End 5.3.14.6 Logging In to the NetEco Client...
  • Page 265: Loading The Neteco Software License

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE ● The preset user of NetEco is admin, the preset password is Changeme_123. This user has all the operation rights on the managed objects. After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering.
  • Page 266: Adding A Management Domain

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning The time required for the installation is related to the number of adapters. Wait for the installation to complete. 5.3.14.9 Adding a Management Domain 5.3.14.9.1 General Operation: Adding a Management Domain Prerequisites The management domain adapter has been preconfigured or installed.
  • Page 267: Example: Adding A Smart Module

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 7 Repeat steps Step 3 Step 6 until the configuration is complete. ----End 5.3.14.9.2 Example: Adding a Smart Module Prerequisites You have created management domains in Planning Configuration. Procedure Step 1 Log in to the NetEco client.
  • Page 268 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Related Procedure Operatio Delete You can delete one module or multiple modules in batches on the modules current page. NOTE If a module contains subdevices, you cannot delete it. You can delete the module only after you delete subdevices in the module.
  • Page 269: Creating An Ecc800-Pro On The Neteco

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.3.14.10 Creating an ECC800-Pro on the NetEco Prerequisites ● You have logged in to the NetEco client using a web browser. ● You have created a smart module in Planning Configuration.
  • Page 270: Setting Snmp Management Parameters

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-86 Connecting a communications cable ----End 5.3.15.2 Setting SNMP Management Parameters Prerequisites Before setting SNMP parameters, obtain the information listed as follows from the NMS. Table 5-50 Information obtained from the NMS...
  • Page 271 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 Apply to the equipment room network administrator for a fixed IP address. Step 2 Set the IP address, subnet mask, and default gateway on the ECC800-Pro WebUI.
  • Page 272: Optional) Edge Data Center Management

    Installing the App NO TE Currently, the NetEco app can be installed only on Android mobile phones. ● Obtaining the software installation package from the Huawei AppGallery and installing the app Go to Huawei AppGallery (https://appgallery.huawei.com) and search for NetEco.
  • Page 273: Optional) Replacing The App Certificate On A Mobile Device

    5.3.16.1.2 (Optional) Replacing the App Certificate on a Mobile Device This section describes how to replace the preset security certificate in the NetEco app on a mobile device. Preset Huawei certificates apply only to commissioning scenarios. For security purposes, apply for certificates from the certification authority (CA) and use them to replace the preset certificates.
  • Page 274: Registering A Neteco App Account

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-88 Replacing a certificate ----End 5.3.16.1.3 Registering a NetEco App Account After the app is correctly installed on a mobile device, you can register an account through the app.
  • Page 275: Connecting A Device

    WiFi or mobile network. If the network is normal, check whether you have been forcibly logged out on the NetEco. If a Huawei phone is used, the push notification function is enabled for the NetEco app by default.
  • Page 276: Connecting A Device (Through The Webui)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-89 Adding a device Table 5-52 Parameter description Parameter Description Device name Name of the device. ESN of the ECC controller. NOTE to scan the QR code on the ECC controller to obtain the ESN.
  • Page 277: Adding A Management Domain

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.3.16.2.1 Adding a Management Domain Before adding a device, you need to create a management domain based on the planned relationship between the management domain and the device. Context The NetEco presets management domains such as parks, equipment rooms, subnets, cabinets, buildings, and floors.
  • Page 278 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 3 On the Uncreated Device Information page, click Access in the Operation column. Step 4 In the Device Integration dialog box, set ECC800-Pro device parameters by referring to Figure 5-90, and click OK.
  • Page 279: Planning Configuration Interface Reference

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE ● If Authentication Password is not set, the default authentication password is used for site deployment. If Authentication Password is set to a valid value, the entered password is used.
  • Page 280 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-53 lists the requirements for the operating environment. Table 5-53 Operating environment requirements Configuration Basic Configuration Requirement Item I5-7500 or later Memory 8 GB Operating Windows 10 Professional 64-bit...
  • Page 281 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Configuration Basic Configuration Requirement Item Browser You are advised to use the Chrome browser (stable channel edition) or Firefox browser (ESR edition) of the latest version. ● If the user accesses the NetEco server through a proxy...
  • Page 282: Logging In To The Neteco (Through Huawei Cloud)

    IP address:server port number (https://10.10.10.1:31943 for example), click Allow, and then click Save Changes. 4. Close the Options tab page. 5.3.16.3.2 Logging In to the NetEco (Through Huawei Cloud) Log in to the NetEco through Huawei Cloud. Prerequisites ●...
  • Page 283: Logging In To The Neteco (Through The Webui)

    Name and is the tenant name entered during tenant creation, that is, the initial user name of Huawei Cloud. This user is the administrator of the tenant and has the highest operation rights. After the first login, you need to change the password to ensure access security.
  • Page 284: Logging Out Of The Neteco

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.3.16.3.4 Logging Out of the NetEco This section describes how to log out of the NetEco. Prerequisites You have logged in to the NetEco. Procedure Step 1 Move the pointer to the icon in the upper right corner of the home page and click Log Out.
  • Page 285 4. Follow the onscreen instructions to enable the Push notifications function. NOTE ● If a Huawei phone is used, the Push notifications function is enabled for the NetEco app by default. ● If a third-party mobile phone is used, you need to manually enable the Push notifications function and ensure that the HMS Core process is not cleared.
  • Page 286: What Do I Do If The Browser Displays A Certificate Error Or Security Risk

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Operation Description Procedure Disabling If you do not need to ● Method 1 the Push view the real-time When the system displays a notificatio alarms pushed by the message asking you whether to...
  • Page 287 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-92 Connection error message (Chrome) Figure 5-93 Connection error message (Firefox) Procedure NO TE Operations on the browser may vary depending on browser versions but are similar to the examples in the following steps.
  • Page 288 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Click Proceed to XX.XX.XX.XX (unsafe). ● Add an exception in the Firefox browser. Click I Understand the Risks, as shown in Figure 5-94. Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 289 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-94 Clicking I Understand the Risks In the expanded area, click Add Exception, as shown in Figure 5-95. Figure 5-95 Adding an exception Click Confirm Security Exception, as shown in Figure 5-96.
  • Page 290: Operation And Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Operation and Maintenance 6.1 Routine Maintenance 6.1.1 Daily Maintenance Table 6-1 Daily maintenance Maintenance Method Expected Result Troubleshooting Item Check alarms. On the ECC800- No abnormal See the ECC800-...
  • Page 291: Monthly Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Check the status Enter the camera The video Check the of the video IP address or surveillance system communication surveillance choose System is working properly.
  • Page 292 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item LCD on the PDF Touch the LCD The LCD screen Check whether the screen with panel displays power cable is your finger. information properly connected.
  • Page 293 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Expected Result Item Method Troubleshooting Visual The air filter is not Replace the air inspection damaged or filter. distorted. Compressor Visual The compressor is Tighten screws if inspection secured.
  • Page 294: Quarterly Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Table 6-4 Monthly maintenance for the management system Maintenance Method Expected Result Troubleshooting Item ECC800-Pro RUN Check the The RUN indicator ● If the RUN indicator (green) RUN indicator blinks slowly.
  • Page 295 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Table 6-6 Quarterly maintenance for the cooling system Maintenance Expected Result Item Method Troubleshooting Monitoring Export smart There are no Locate the fault or cooling abnormal records in contact technical product logs, alarms.
  • Page 296 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Expected Result Item Method Troubleshooting Wet film Start the Water drainage is ● If no water is humidifier equipment, normal. supplied, check choose Maint the cable > Diagnostic connection or Mode >...
  • Page 297 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Indicators on Observe the ● If the PWR ● If the PWR the smart ETH PWR, RUN, indicator is steady indicator is off,...
  • Page 298: Semiannual Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.1.4 Semiannual Maintenance Table 6-8 Semiannual maintenance for the power supply and distribution system Maintenance Method Expected Result Troubleshooting Item UPS cleanliness Visual inspection The white paper If the white paper...
  • Page 299 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Evaporator Visual inspection The evaporator Use a fin brush to appearance fins are not organize the fins pushed down. that are pushed down.
  • Page 300 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Table 6-10 Semiannual maintenance for the management system Maintenanc Method Expected Result Troubleshooting e Item Availability On the ECC800- The connection If the display is of the smart Pro WebUI,...
  • Page 301 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenanc Method Expected Result Troubleshooting e Item LAN switch Observe the PWR The PWR indicator Take corrective availability indicator on the is steady green. measures based on LAN switch.
  • Page 302 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenanc Method Expected Result Troubleshooting e Item ● Steady green: The LAN switch is not running properly or is starting. ● Steady orange: The indicator is under a self-test during the startup.
  • Page 303: Annual Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenanc Method Expected Result Troubleshooting e Item Aisle door Check whether The door can be If the door cannot be availability the door can be opened and closed opened or closed opened and smoothly.
  • Page 304: Alarm Handling

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Battery capacity When the UPS is The test result is 1. Locate the test backed up, Pass. cause when an discharge a exception is battery to the identified.
  • Page 305: Alarm Handling Flowchart

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.2.1 Alarm Handling Flowchart Figure 6-1 Alarm handling flowchart 6.2.2 Viewing and Collecting Alarm Information Prerequisites An alarm is generated. NO TE Alarm information helps to rapidly locate and rectify faults.
  • Page 306: Determining The Faulty Area And Alarm Severity

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Log in to the ECC800-Pro WebUI. Step 2 Click Active Alarms on the home page to view the current alarm information. Step 3 Collect alarm information.
  • Page 307: Locating And Rectifying Faults

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.2.4 Locating and Rectifying Faults Locating Faults Locate faults from the following aspects: ● Component: Locate the component for which the alarm is generated. ● Module: Locate the faulty module after locating a faulty component.
  • Page 308 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-2 Troubleshooting flowchart After an alarm is cleared, prepare a report to record the alarm handling process. NO TE Common alarm references are as follows: ● Data center infrastructure alarm reference in the online help of the management system ●...
  • Page 309: Parts Replacement

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.3 Parts Replacement 6.3.1 ECC800-Pro Common Operations 6.3.1.1 Preparations and Login Prerequisites ● Supported operating system: Windows 7 and later versions ● Recommended screen resolution: 1366 x 768 or higher ●...
  • Page 310 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance If the WAN1 port IP address is 192.168.8.10, subnet mask is 255.255.255.0, and default gateway is 192.168.8.1, set the PC IP address to 192.168.8.12, subnet mask to 255.255.255.0, and default gateway to 192.168.8.1.
  • Page 311 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-4 Setting parameters NO TE When switching between different versions of the ECC800-Pro on your PC, you are advised to clear the historical Internet Explorer cache. Failing to do so may cause information missing or exception after login.
  • Page 312: Parameter Sync

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance On the login page, enter the preset user name admin and preset password Changeme, set the language, and click Log In. NO TE – After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering.
  • Page 313 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Use the Back Up Current Settings function to record the ECC800-Pro configuration information or manually record the information. Path: Maintenance > Configuration File > Back Up Current Settings NO TE If the main control module is damaged, login may fail and backup cannot be performed.
  • Page 314: Replacing An Ecc800-Pro Psu

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Step 8 Connect the communications cables and antennas to the ECC800-Pro main control module. Step 9 Choose Maintenance > Configuration File and import the backup configuration file, or set parameters for the devices that connect to the ECC800-Pro to ensure normal communication.
  • Page 315: Replacing A Sim Card And Microsd Card

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Prerequisites ● Tools: ESD wrist strap, ESD gloves ● Materials: Spare ECC800-Pro antennas of the same model are available and functional. Procedure Step 1 Remove the 4G antenna cables and RF_Z antenna cables connected to the ports...
  • Page 316: Replacing Parts For The Integrated Ups

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-10 Removing an ECC800-Pro main control module Step 4 Remove the SIM card and MicroSD card from the card slots. Figure 6-11 Removing a SIM card and a MicroSD card Step 5 Install the spare SIM card and MicroSD card into the card slots.
  • Page 317: Parts Replacement For The Integrated Pdf

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Table 6-14 Replaceable parts of the integrated UPS Replaceable Part Fuse Indicator Circuit breaker NO TE If other components need to be replaced, contact technical support. 6.3.4 Parts Replacement for the Integrated PDF For details about parts replacement for the integrated PDF, see section "Parts...
  • Page 318: Parts Replacement For Smart Busbars

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Table 6-16 Replaceable parts of the precision PDF Replaceable Part MCB (Miniature circuit breaker) MDU (Monitor display unit) SPD (Surge protective device) Fuse Indicator Power distribution detection module NO TE If you need to replace any other parts, contact technical support.
  • Page 319: Replacing An Rpdu

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.3.7 Replacing an rPDU Impact on the System One power input of the equipment cannot work. Preparations ● Tools: Phillips screwdriver, step ladder, multimeter ● Material: A spare and functional rPDU of the same model ●...
  • Page 320: Replacing Smart Cooling Product Parts

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Context The smart rPDU is installed near the rear door of the cabinet. Procedure Step 1 Open the rear door of the cabinet. Step 2 Connect the IT load of the faulty smart rPDU to a normal rPDU.
  • Page 321: Replacing A Smart Eth Gateway

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Replaceable Part Control panel Module Electric heater NO TE If other components need to be replaced, contact technical support. 6.3.10 Replacing a Smart ETH Gateway Prerequisites ● Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, step ladder, label, marker ●...
  • Page 322: Replacing A Cabinet Electronic Lock

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Install the app on the reserved pad (see the commissioning guide) and connect the pad to the network over the WiFi hotspot of the data center.
  • Page 323: Replacing A Camera

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Step 5 On the ECC800-Pro WebUI, choose Monitoring > System > ECC800 > Controls > Delete device with communication failure, and click Submit. Step 6 Check that the electronic lock functions properly.
  • Page 324: Replacing An Ivs1800

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Step 3 Remove the monitoring network cable from the camera and remove the camera. Figure 6-16 Removing the camera Step 4 Install the new camera and SD card. Then, set parameters and commission the camera according to the commissioning guide.
  • Page 325: Replacing A Hard Disk For The Ivs1800

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Turn off the power switch of the IVS1800, disconnect the power supply of the IVS1800, remove the cables from the IVS1800, label the cables, and record the original connection positions of the cables.
  • Page 326 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Context Recommended tools and materials: Phillips screwdriver, ESD wrist strap (or ESD gloves). Procedure Step 1 Put on an ESD wrist strap (or ESD gloves) and insert the ground terminal into the ESD jack in the cabinet.
  • Page 327 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Insert the hard disk tray back at 45 degrees with the opening of its locking buckle facing downwards, hold the screw in the red-framed part to lower the hard disk tray until it is level, and fasten the black screws on the left and right sides and the white screw on the top.
  • Page 328: Replacing An Aisle T/H Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.3.16 Replacing an Aisle T/H Sensor Prerequisites ● Recommended tools: Phillips screwdriver, flat-head screwdriver ● A T/H sensor needs to be replaced. ● A spare T/H sensor of the same model is available and functional.
  • Page 329 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-24 Removing a T/H sensor NO TE Before installing the new T/H sensor, check that its DIP switch settings are consistent with the DIP switch settings of the old T/H sensor.
  • Page 330: Replacing A Temperature Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-25 Installing a T/H sensor Step 5 Choose Monitoring > System > ECC800-Pro > Controls and delete the device failing in communication. Step 6 Choose Monitoring > Aisle > T/H Sensor Group and check whether the T/H sensor works properly.
  • Page 331 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-26 Removing a temperature sensor Step 2 Install the spare temperature sensor, bind it to the original position using cable ties, and connect cables to it. NO TICE ●...
  • Page 332: Replacing A Remote T/H Sensor (33010516)

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.3.18 Replacing a Remote T/H Sensor (33010516) Prerequisites ● A T/H sensor needs to be replaced. ● A spare T/H sensor of the same model is available and functional.
  • Page 333: Replacing A Water Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Remove the faulty smoke detector from the top of the PDF. Step 2 Remove the cables from the smoke detector and apply insulation measures such as wrapping the cables with insulation tape to avoid hazards.
  • Page 334 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-27 Connecting a conversion cable to a water detector Step 2 Replace a water detection cable. Remove the faulty water detection cable from the port. Connect a new water detection cable.
  • Page 335: Appendix

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Appendix 7.1 Installing an Expansion Bolt Preparations Tools: adjustable wrench, hammer drill, rubber mallet, protective gloves, vacuum cleaner Material: expansion bolt Procedure Step 1 Use a hammer drill to drill a hole to the depth of 52 mm to 60 mm at the position for installing the expansion bolt.
  • Page 336 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Figure 7-1 Components of an expansion bolt (1) M12 bolt (2) Spring washer (3) Flat washer (4) Expansion sleeve Figure 7-2 Drilling a hole and installing an expansion bolt (unit: mm)
  • Page 337: Preparing A Monitoring Cable

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix 7.2 Preparing a Monitoring Cable Prerequisites ● Network cables, cord end terminals, and RJ45 connectors are prepared. ● The following tools are prepared: – Wire stripper – Crimping tool – RJ45 crimping tool –...
  • Page 338: Preparing Load Cables

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Figure 7-4 Preparing an RS485 monitoring cable for the ECC collector Preparing a Dry Contact Monitoring Cable The method of preparing a dry contact monitoring cable is similar to the method of preparing the RS485 monitoring cable.
  • Page 339 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Figure 7-5 Stripping a cable (unit: mm) Crimp a cord end terminal. Figure 7-6 Crimping a cord end terminal (1) Cord end terminal (2) Cable (3) Crimping tool (Optional) For a three-core cable with a cross-sectional area of 6 mm...
  • Page 340: Common Screw Torques

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Figure 7-8 Installing cables at a round connector ----End 7.4 Common Screw Torques NO TE The common screw torques are for reference only. The specific torque requirements depend on the connector material. If the following table conflicts with the installation requirements of a specific product or device, the installation requirements of the product or device may vary.
  • Page 341 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Application Scenario Screw Specifications Torque (N·m) (Tolerance: ±10%) M4 countersunk screw (mounting ear) M6 panel screw Ground Cabinet or chassis ST3.5 tapping screw + installation, cable plastic expansion sleeve tray, upper fastener,...
  • Page 342: Installation Verification

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Application Scenario Screw Specifications Torque (N·m) (Tolerance: ±10%) M16 screw assembly Cord end terminals 0.22–0.25 M2.5 0.5–0.6 0.6–0.8 M3.5 0.8–1.6 1.5–1.8 2.5–3.0 3.2–3.7 7.5 Installation Verification Cabinet Installation Checklist Check Item...
  • Page 343 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Aisle Containment Installation Checklist Check Item Check Result All components of the aisle containment are □ Passed □ Failed installed. All labels are correct, clear, and complete. □ Passed □ Failed There is no foreign matter such as adhesive tape, □...
  • Page 344: Acronyms And Abbreviations

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Electric Installation Checklist Check Item Check Result All ground cables are copper cables with □ Passed □ Failed diameters meeting the requirements. No switch or fuse is installed on a ground cable, and no open circuit occurs.
  • Page 345 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix direct current energy control center EPDM ethylene-propylene-diene monomer expandable polyethylene Ethernet fast Ethernet integrated circuit internet technology negative temperature coefficient power distribution frame power distribution unit protective earthing power over Ethernet Issue 07 (2022-09-30) Copyright ©...
  • Page 346 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix PP-R polypropylene random polyvinyl chloride secure digital subscriber identity module uninterruptible power system WiFi wireless fidelity Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd.

This manual is also suitable for:

V100r021c10

Table of Contents