Sign In
Upload
Manuals
Brands
Huawei Manuals
Data Loggers
FusionDC1000A
Huawei FusionDC1000A Manuals
Manuals and User Guides for Huawei FusionDC1000A. We have
9
Huawei FusionDC1000A manuals available for free PDF download: Maintenance Manual, Installation Manual, Product Description, Manual, Commissioning Manual, Quick Manual
Huawei FusionDC1000A Maintenance Manual (180 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Storage
| Size: 10.49 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Safety Information
9
General Safety
9
Personnel Requirements
12
Electrical Safety
12
Installation Environment Requirements
14
Mechanical Safety
16
Cooling System Safety
18
Pre-Fab. Module Safety
19
Battery Safety
20
Others
22
2 Operation and Maintenance Preparations
23
Tools
23
Reference Documentation
25
Pre-Fab. Module Entry and Working Requirements
25
O&M Personnel Skill Requirements
26
3 Routine Maintenance
28
Pre-Fab. Module Repainting
28
Sliding Cabinets
32
Daily Maintenance
33
Monthly Maintenance
34
Power Supply and Distribution System
35
Cooling System
36
Monitoring System
37
Fire Extinguishing System (Standard)
40
Fire Extinguishing System (CE)
41
Other Systems
42
Quarterly Maintenance
43
Power Supply and Distribution System
43
Monitoring System
43
Fire Extinguishing System (Standard)
46
Fire Extinguishing System (CE)
47
Other Systems
48
Semi-Annual Maintenance
48
Power Supply and Distribution System
49
Cooling System
50
Monitoring System
51
Fire Extinguishing System (Standard)
52
Fire Extinguishing System (CE)
55
Other Systems
57
4 Parts Replacement
59
Replacing Components for the Power Supply and Distribution System
59
Components that Can be Replaced for the Power Supply and Distribution System
59
Replacing Smartli Components
59
Replacing an MDU
60
Replacing a BCU
60
Replacing a Battery Module
61
Replacing an Rpdu
62
Replacing a Light
63
Replacing the Power PDB
64
Replacing Cooling System Components
65
Replacing Components for the Cooling System
65
Replacing an In-Row Air Cooled Smart Cooling Product
66
Replacing a T/H Sensor
81
Replacing an Electric Heating Belt
83
Replacing the Air Filter
83
Replacing the Indoor Fan
84
Replacing an Outdoor Fan
85
Replacing the Differential Pressure Switch
87
Replacing the High Pressure Switch
89
Replacing the Compressor
91
Replacing the Welded Filter Dryer (Welding Connection)
94
Optional) Replacing the Liquid Level Detector
96
Optional) Replacing the Condenser Pump
99
Optional) Replacing a Wet Film Humidifier
103
Replacing the Controller Panel
104
Replacing the Module
106
Replacing the Electric Control Box
108
Replacing the Transformer
110
Replacing Monitoring System Components
111
Replacing an ECC800-Pro Main Control Module
111
Replacing an ECC800-Pro PSU
113
Replacing ECC800-Pro Antennas
114
Replacing a SIM Card
114
Replacing a Smart ETH Gateway
116
Replacing a Camera
116
Replacing a Water Sensor (Point Type)
118
Replacing Access Control System Components
119
Replacing a Card Reader
119
Replacing an Exit Button
121
Replacing an Emergency Door Release Button
122
Replacing an Access Actuator
123
Replacing a Door Status Sensor
124
Replacing an AC Actuator
125
Replacing a T/H Sensor
126
Replacing the Wifi Module
126
Optional) Replacing a PAD
127
Replacing Fire Extinguishing System Components (Standard)
128
Changing an Address Code
128
Replacing a Smoke Detector
128
Replacing a Heat Detector
130
Replacing an Input/Output Module
132
Replacing a Gas Release Indicator
133
Replacing a Fire Alarm Horn/Strobe
135
Replacing an Internal Fire Alarm Horn/Strobe
136
Replacing a Fire Alarm Sounder
137
Replacing the Emergency Start/Abort Switch
139
Replacing Batteries for the Fire Alarm Control Panel
141
Replacing a Fire Cylinder
143
Replacing a Fire Alarm Control Panel
148
Replacing an Emergency Light
151
Replacing Batteries for the ASD Power Box
152
Replacing Fire Extinguishing System Components (CE)
153
Replacing a Smoke Detector (CE)
153
Replacing a Heat Detector (CE)
155
Replacing Warning Signs (CE)
156
Replacing an Internal Horn Strobe (CE)
157
Replacing an External Horn Strobe (CE)
159
Replacing a Fire Alarm Bell (CE)
161
Replacing an Extinguishant Abort Button (CE)
162
Replacing Batteries for the Extinguishant Control Panel (CE)
165
Replacing a Fire Cylinder (CE)
166
Replacing the Fire Cylinder in the Lithium Battery Cabinet
169
Replacing an Extinguishant Control Panel (CE)
172
Replacing an Emergency Light (CE)
174
Replacing Batteries for the ASD Power Box
175
Advertisement
Huawei FusionDC1000A Product Description (125 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Network Hardware
| Size: 6.84 MB
Table of Contents
About this Document
3
Table of Contents
5
Overview
8
Positioning
8
Features
8
Typical Application Scenarios and Typical Configuration
10
Application Scenarios of the Prefabricated Data Center
10
Typical Configuration
11
Key Technical Specifications
12
Structural System
17
Pre-Fab. Module
17
Pre-Fab. Module Thermal Insulation Structure
18
Pre-Fab. Module Coating
18
Pre-Fab. Module Doors
19
Pre-Fab. Module Interior Layout
20
Components Inside the Pre-Fab. Module
21
Overhead Cable Tray
21
Suspended Ceiling
22
Cabinet
22
Raised Floor
24
Aisle Sliding Door
25
Cabinet Base
26
External Ports of the Pre-Fab. Module
26
Power Supply and Distribution System
29
Overview
29
Integrated UPS
34
Product Structure
34
Technical Specifications
36
Rpdu
39
Smartli Cabinet Description
40
Smartli Components
41
Mdu
41
Monitoring Interface Unit
42
Bcu
44
Battery Module
46
Carbon Monoxide Gas Sensor
47
Module
49
Lead-Acid Battery Pack
50
Lead-Acid Battery Cabinet
51
Power PDB
51
Ac Pdb
52
Cooling System
54
Overview
54
Netcol5000-A025 Smart Cooling Product
57
Product Composition
57
Operating Environment Specifications
60
Technical Specifications
62
Dehumidifier
63
T/H Sensor
64
Outdoor Unit
65
Fan
67
Low Temperature Component
68
Management System
70
Overview
70
ECC800-Pro
73
Product Configuration
73
Technical Specifications
75
Main Control Module
78
Psu
84
UIM20A Expansion Module
86
Smart ETH Gateway
89
AC Actuator
90
Access Actuator
93
IP Camera
97
Wifi Module
97
WLDS900 Water Sensor (BOM Number: 33010352)
98
IC Card Reader
100
Door Status Switch
101
Emergency Door Release Button
102
Exit Button
103
Magnetic Lock
103
Non-Location-Type Water Sensor
104
Pad
105
Fire Extinguishing System
106
Extinguishant Control Panel (CE)
110
Extinguishant Control Panel
111
Perfluorohexanone Automatic Fire Extinguisher
111
Smoke Sensor
112
Heat Detector
113
Optional) ASD
114
Emergency Light and Escape Sign
115
Fire Alarm Bell
116
Extinguishant Abort Button
117
Fire Alarm Horn Strobe
117
Warning Sign
118
Surge Protection and Grounding
120
Surge Protection
120
Grounding
120
Integrated Cabling
122
A Acronyms and Abbreviations
124
Huawei FusionDC1000A Installation Manual (130 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Data Loggers
| Size: 10.07 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Safety Information
8
General Safety
8
Personnel Requirements
11
Electrical Safety
11
Installation Environment Requirements
13
Mechanical Safety
15
Cooling System Safety
17
Pre-Fab. Module Safety
18
Battery Safety
19
Others
21
2 Site Requirements
22
Site Selection Requirements
22
Field Requirements
22
Optional) Concrete Platform Scenario
23
Base Installation Scenario
23
Power Supply and Distribution Requirements
25
Grounding Requirements
26
Water Refill and Drainage Requirements
26
Water Refill Requirements
26
Drainage Requirements
27
Pipe Anti-Freezing
27
External Environment Requirements
29
3 Installation Preparations
30
Obtaining Tools and Materials
30
Installation Personnel Requirements
35
Checking the Installation Environment
36
4 Installing a Pre-Fab. Module
37
Optional) Concrete Platform Scenario
37
Determining the Pre-Fab. Module Installation Position
37
Removing the Pre-Fab. Module Protective Cover
38
Hoisting the Pre-Fab. Module
39
Optional) Base Installation Scenario
43
Determining the Pre-Fab. Module Installation Position
44
Removing the Pre-Fab. Module Protective Cover
49
Hoisting and Securing the Pre-Fab. Module
50
Grounding the Pre-Fab. Module
53
5 Installing External Accessories for the Pre-Fab. Module
55
Optional) Installing External Cable Trays
55
Optional) Installing Awnings
57
Optional) Installing Step Ladders
61
6 Installing External Pipes for Smart Cooling Products
64
7 Removing Transport Protection Materials
67
Removing Transport Protection Materials for Smart Cooling Products
67
Removing Transport Fasteners from Cabinets
70
Removing Sliding Door Fasteners
73
8 Installing Devices Inside the Pre-Fab. Module
75
Installing Power Supply and Distribution Devices
75
Installing Battery Modules
76
Optional) Installing the Electric Heating Belt
79
Installing Monitoring Devices
82
Optional) Installing a 2288X V5 Server
82
Optional) Installing ECC800-Pro Accessories
83
Installing a PAD
87
Installing Fire Extinguishing Devices
88
Installing CE-Certified Fire Extinguishing Devices
88
Optional) Installing the Fire Cylinder
88
Connecting the Cables to Extinguishant Control Panel Batteries
91
Installing Standard Fire Extinguishing Devices
92
Optional) Installing the Fire Cylinder
92
Connecting the Cables to Fire Alarm Control Panel Batteries
97
Optional) Connecting the Cables to ASD Power Box Batteries
98
Removing the Fire Cylinder in the Smartli Cabinet and Filling Extinguishant
99
9 Installing Cables Outside the Pre-Fab. Module
104
Connecting Input Power Cables for the Pre-Fab. Module
104
Optional) Connecting Generator Start/Stop Cables (ATS Input)
105
10 Removing Transport Protection Materials from Fire Extinguishing and Monitoring Devices
107
11 Installation Verification
110
A Basic Installation Operations
112
Cable Installation Techniques
112
Cabling Rules
112
Measuring Cables
113
Laying out Cables
114
Routing Cables through a Plastic-Coated Metal Hose
115
Mounting Cables on the Cable Tray
116
Routing Cables into Feeder Windows
117
Installing DPJ End Connectors
118
Installing Waterproof Metal Connectors
121
Attaching Cable Labels
123
Preparing Cable Terminals
124
B Dimensions of External Cable Trays and Fixed Ladders
126
C Cleaning Pre-Fab. Modules
128
D Acronyms and Abbreviations
129
Advertisement
Huawei FusionDC1000A Manual (112 pages)
Brand:
Huawei
| Category:
Industrial Equipment
| Size: 7.85 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Overview
8
Positioning
8
Features
8
2 Typical Application Scenarios and Typical Configuration
12
Application Scenarios of the Prefabricated Data Center
12
Typical Configuration
14
Key Technical Specifications
15
3 Structural System
20
Pre-Fab. Module
20
Pre-Fab. Module Thermal Insulation Structure
21
Pre-Fab. Module Coating
21
Pre-Fab. Module Doors
22
Pre-Fab. Module Interior Layout
24
Components Inside the Pre-Fab. Module
24
Overhead Cable Tray
25
Suspended Ceiling
26
Cabinet
26
Raised Floor
28
Aisle Sliding Door
29
Cabinet Base
30
External Ports of the Pre-Fab. Module
30
4 Power Supply and Distribution System
33
Overview
33
Integrated UPS
37
Product Structure
37
Technical Specifications
39
Rpdu
42
Smartli
43
Battery Module
45
Bcu
47
Monitoring Interface Unit
48
Mdu
50
Power PDB
53
Ac Pdb
54
5 Cooling System
55
Overview
55
Netcol5000-A025 Smart Cooling Product
58
Product Composition
58
Operating Environment Specifications
61
Technical Specifications
63
Outdoor Unit
64
Fan
66
Low Temperature Component
67
6 Management System
69
Overview
69
ECC800-Pro
72
Product Configuration
73
Main Control Module
74
Power Module
82
UIM20A Expansion Module
84
Smart ETH Gateway
87
Access Actuator
88
AC Actuator
90
T/H Sensor
93
IP Camera
94
Wifi Module
95
Water Sensor
96
Pad
97
7 Fire Extinguishing System
98
Overview
98
Optional) CE Fire Extinguishing System
99
Extinguishant Control Panel
100
Heptafluoropropane Automatic Fire Extinguisher
101
Optional) Standard Fire Extinguishing System
102
Fire Alarm Control Panel
102
Heptafluoropropane Automatic Fire Extinguisher
103
Fire Detection and Extinguishing Equipment for Lithium Battery Modules
104
8 Surge Protection and Grounding
107
Surge Protection
107
Grounding
107
9 Integrated Cabling
109
Huawei FusionDC1000A Commissioning Manual (85 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Storage
| Size: 4.06 MB
Table of Contents
About this Document
3
Table of Contents
5
Safety Information
7
Personal Safety
8
Electrical Safety
10
Environmental Requirements
14
Mechanical Safety
16
Equipment Safety
21
UPS Safety
22
Cooling System Safety
23
Battery Safety
23
Commissioning Guide Usage
31
Preparations for Power-On Commissioning
32
Tools
32
Reference Documentation
34
Commissioning Personnel Skill Requirements
34
Check before Power-On
35
Commissioning Core Devices
40
Commissioning the Integrated UPS
40
Optional) Commissioning the ATS
40
Powering on and Starting the UPS
41
Power-On
41
Starting the Inverter
42
Powering on Loads
42
Commissioning the Smartli
43
Connecting the Battery Supply
43
Powering off Batteries
47
Performing EPO
48
Clearing the EPO State
48
Commissioning Smart Cooling Products
49
Commissioning Monitoring Devices
50
Commissioning the Access Control System
50
Commissioning Fire Extinguishing Devices (Standard)
51
Commissioning the Fire Alarm Control Panel (Standard)
51
Commissioning the Emergency Light (Standard)
52
Commissioning Fire Extinguishing Devices (CE)
53
Commissioning the Emergency Light (CE)
54
Optional) Commissioning the ASD
55
Optional) Neteco Management
56
Preparations and Webui Login
56
Performing Basic Operations before Adding Devices
60
IP Address Preinstallation Planning
61
Obtaining the Neteco Software License
61
Logging in to the Neteco Client
61
Loading the Neteco Software License
62
Installing NE Adapters
62
Creating a Management Domain
63
How Can I Set and Add a Smartli (Modbus-TCP)
64
Process of Adding a Device
65
Setting and Adding the ECC800 Collector
66
Setting Management System Parameters
67
Setting the Transparent Transmission Function for the ECC800-Pro Collector
68
System Commissioning
71
Switching between Two Power Supplies
71
Fire Extinguishing System Commissioning (3C)
72
Fire Extinguishing System Commissioning (CE)
78
System Power-Off
84
A Acronyms and Abbreviations
85
Huawei FusionDC1000A Commissioning Manual (74 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Storage
| Size: 4.8 MB
Table of Contents
About this Document
3
Table of Contents
5
Safety Information
7
General Safety
7
Personnel Requirements
10
Electrical Safety
10
Installation Environment Requirements
12
Mechanical Safety
14
Cooling System Safety
16
Pre-Fab. Module Safety
17
Battery Safety
18
Others
20
Commissioning Guide Usage
21
Preparations for Power-On Commissioning
22
Tools
22
Reference Documentation
24
Commissioning Personnel Skill Requirements
24
Check before Power-On
25
Commissioning Core Devices
30
Commissioning the Integrated UPS
30
Optional) Commissioning the ATS
30
Powering on and Starting the UPS
31
Powering on the UPS
31
Starting the Inverter
32
Powering on Loads
32
Commissioning the Smartli
33
Powering on Batteries
33
Powering off Batteries
37
Performing EPO
37
Clearing the EPO State
38
Commissioning Smart Cooling Products
38
Commissioning Monitoring Devices
40
Commissioning the Access Control System
40
Commissioning Fire Extinguishing Devices (Standard)
41
Commissioning the Fire Alarm Control Panel (Standard)
41
Commissioning the Emergency Light (Standard)
42
Commissioning Fire Extinguishing Devices (CE)
43
Commissioning the Emergency Light (CE)
43
Optional) Commissioning the ASD
45
Optional) Neteco Management
46
Preparations and Webui Login
46
Performing Basic Operations before Adding Devices
49
IP Address Preinstallation Planning
50
Obtaining the Neteco Software License
51
Logging in to the Neteco Client
51
Loading the Neteco Software License
52
Installing NE Adapters
52
Creating a Management Domain
53
How Can I Set and Add a Smartli (Modbus-TCP)
54
Process of Adding a Device
55
Setting and Adding the ECC800 Collector
56
Setting Neteco Parameters
56
Setting the Transparent Transmission Function for the ECC800-Pro Collector
58
System Commissioning
60
Switching between Two Power Supplies
60
Fire Extinguishing System Commissioning (Standard)
61
Fire Extinguishing System Commissioning (CE)
67
System Power-Off
72
A Acronyms and Abbreviations
74
Huawei FusionDC1000A Quick Manual (62 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Data Loggers
| Size: 10.16 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Quick Guide Usage
6
2 Installation Guide
8
Lowering a Fan (Applicable to Downflow Units)
8
3 Installation Drawings
11
4 Removing Transport Protection Materials
31
5 Initial Configuration Parameters
32
A Common Torque Selection Table
60
Huawei FusionDC1000A Quick Manual (63 pages)
Prefabricated Modular Data Center
Brand:
Huawei
| Category:
Network Hardware
| Size: 12.07 MB
Table of Contents
About this Document
3
Table of Contents
5
Quick Guide Usage
6
Installation Drawings
8
Removing Transport Protection Materials
34
Initial Configuration Parameters
35
A Common Torque Selection Table
61
Huawei FusionDC1000A Quick Manual (55 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Industrial Equipment
| Size: 6.47 MB
Table of Contents
About this Document
3
Table of Contents
5
Quick Guide Usage
6
Installation Drawings
8
Removing Transport Protection Materials
24
Initial Configuration Parameters
25
A Common Torque Selection Table
53
Advertisement
Related Products
Huawei FusionDC1000B
Huawei FusionDC1000A40
Huawei FusionModule500
Huawei FusionModule1000A40 ICT Solution
Huawei FusionModule800
Huawei FusionModule2000 V500R002C03
Huawei FusionModule1000A
Huawei FusionCol8000-E240H4
Huawei FusionPower6000
Huawei FusionCol8000-E24
Huawei Categories
Cell Phone
Network Router
Wireless Router
Modem
Inverter
More Huawei Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL