Huawei iMaster NetEco V600R021C10 Device Installation And Commissioning Manual page 49

Table of Contents

Advertisement

iMaster NetEco
Device Installation and Commissioning Guide (Data
Center)
Figure 3-29 Connecting the water detection cable to the conversion cable
(1) Conversion cable end B, connecting to the
water detection cable
Step 3 Connect the other end of the conversion cable to the water detector.
Figure 3-30 Connecting the water detector
Step 4 Plan the installation position for the fastener of the water detection cable. Ensure
that the water detection cable placed on the fastener is in good contact with the
floor.
Do not contact the water detection cable to metal, for this action will cause a
false alarm. Take protective measures when routing a water detection cable.
Step 5 Tear off the protection paper on the rear of the fastener, then securely attach the
fastener to the floor.
Figure 3-31 Installing a fastener
Issue 02 (2021-05-12)
NO TE
The water detection cable and conversion cable are interconnected through the male and
female connectors.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
(2) Water detection cable end A, connecting to
the conversion cable
3 Installing Devices
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents