Figure 3-5 Installing a server
Step 4 Connect the server power cables to the PDU.
Wear an ESD wrist strap when connecting power cables.
----End
3.2.2 Installing a 2288X V5 Server
Context
Tool: Phillips screwdriver
Materials: 2288X V5 server, guide rail, rubber plug, screw
Procedure
Step 1 Install guide rails.
Issue 02 (2021-05-12)
WARNING
NO TE
The server uses dual power supplies. Connect the two power cables to different PDUs.